Project Hydropower Plant "Iller Au" - An Ecological Compatible Hydropower Plant with Dynamic Regulation of Operation Water Level

被引:0
|
作者
Fessler, Walter [1 ]
Wiegand, Volker [1 ]
Brennauer, Bernd [1 ]
Schuchert, Michael [2 ]
机构
[1] Allgauer Uberlandwerk GmbH AUW, Illerstr 18, D-87435 Kempten, Germany
[2] Ingenieurbiko Dr Ing Koch Bauplanung GmbH, Beethovenstr 13, D-87435 Kempten, Germany
关键词
D O I
暂无
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The article reports about the project development process to the point of the initial operation of a VLH-turbine with two rubber dams including an outlet-dependency on the regulation of operation water level. The characteristic of this power plant, situated on the river Iller in Sulzberg near Kempten, is a low head between 1.4 and 2.3 m as well as the local conditions. The use of the VLH-technique in a mountain river and in combination with a dynamic regulation of retention water level elevation is so far unique. To improve the annual output of approximately 3.9 million kWh/a, the retention water level elevation will be triggered for a defined schedule and therefore the ecological changes of the aquatic ecology will be minimized. The realization of this project supports the strategy of the Bavarian government in a program for small power plants with an installed capacity < 1 MW. In this context the Bavarian government focuses also on innovative concepts of water power plants, which represent a special water-compatible kind of water power as "ecological water power stations". For realization of this project a joint company, the Illerkraftwerk Au GmbH was established by AUW and the Bavarian Landeswasserkraftwerke GmbH.
引用
下载
收藏
页码:55 / 61
页数:7
相关论文
共 50 条
  • [11] Hydropower plant in Rheinfelden officially put into operation
    Heimerl, Stephan
    WASSERWIRTSCHAFT, 2012, 102 (1-2) : 85 - 85
  • [12] Optimal operation of a hydropower plant in a stochastic environment
    Figuerola-Ferretti, Isabel
    Schwartz, Eduardo
    Segarra, Ignacio
    QUANTITATIVE FINANCE, 2024, 24 (05) : 521 - 539
  • [13] Ecological Measures in the Neighborhood of the new Hydropower Plant Rheinfelden
    Ulrich, Jochen
    WASSERWIRTSCHAFT, 2013, 103 (06) : 43 - 47
  • [14] Cambodia's Largest Hydropower Plant Begins Operation
    Larson, Aaron
    POWER, 2015, 159 (03) : 8 - 8
  • [15] EXPERIENCES IN PUTTING KISKORE-HYDROPOWER-PLANT INTO OPERATION
    LAKI, G
    ENERGIA ES ATOMTECHNIKA, 1976, 29 (01): : 8 - 18
  • [16] Object processing of model for economic operation in hydropower plant
    Ma, Yuexian
    Wang, Sujiao
    Wang, Yanhua
    Yuan, Wenlin
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2008, 27 (05): : 1 - 4
  • [17] The Optimization Capabilities of Combined Solar/Hydropower Plant Operation
    Coban, Hasan H.
    Moskins, Igors
    Sauhats, Antans
    2016 IEEE 4TH WORKSHOP ON ADVANCES IN INFORMATION, ELECTRONIC AND ELECTRICAL ENGINEERING (AIEEE), 2016,
  • [18] Capacity optimization of pumped storage hydropower and its impact on an integrated conventional hydropower plant operation
    Nasir, Jehanzeb
    Javed, Adeel
    Ali, Majid
    Ullah, Kafait
    Kazmi, Syed Ali Abbas
    APPLIED ENERGY, 2022, 323
  • [19] Water-carbon nexus of hydropower: The case of a large hydropower plant in Tibet, China
    Zhang, Jin
    Xu, Linyu
    Cai, Yanpeng
    ECOLOGICAL INDICATORS, 2018, 92 : 107 - 112
  • [20] Ecological assessment of the world's first shaft hydropower plant
    Knott, Josef
    Mueller, Melanie
    Pander, Joachim
    Geist, Juergen
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2023, 187