Interference fit process development for the ITER Vacuum Vessel Gravity Support mock-up fabrication

被引:0
|
作者
Cheon, Jason [2 ]
Park, Chulkyu [1 ]
Moon, Hokyu [1 ]
Chung, Woo-Ho [1 ]
Kim, Hyun-Soo [1 ]
Hong, Kwen-Hee [1 ]
Kim, Gwang-Ho [1 ]
Kim, Yu-Gyeong [1 ]
机构
[1] ITER Korea, Natl Fus Res Inst, Daejeon 305333, South Korea
[2] Korea Inst Ind Technol, Incheon 21999, South Korea
基金
新加坡国家研究基金会;
关键词
ITER; Vacuum Vessel Gravity Support; Interference fit; Shrink fit; Lumped capacitance method; Coolant charging method;
D O I
10.1016/j.fusengdes.2019.03.063
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The ITER Vacuum Vessel (VV) is supported by the nine VV gravity supports (VVGS) located on the cryostat toroidal pedestal. The VVGS is dual hinge type that fastened by dowel in the hinge-block hole. This paper presents the technical approach and result on the interference fitting process of the sleeve to the full-scaled VVGS mock-up. Since the sleeve and the hinge-block hole have under millimeter tolerance and around two-meter long length, the shrink fit method has been selected for the interference fitting of the sleeve into the hinge-block hole. The duration time for required shrinkage was expected by the simple analytical approach of natural convective heat transfer. The coolant charging method was suggested to secure a sufficient time for the process. The liquid nitrogen was charged to the handling fixture capped sleeve hole's cavity. As a result, the necessary contraction time was secured as thousands of seconds. Consequently, the interference fitting was successfully done for VVGS mock-up fabrication, and the technical solutions will be applied to the VVGS manufacturing.
引用
收藏
页码:1907 / 1911
页数:5
相关论文
共 35 条
  • [1] Mock-up of a support structure of the ITER vacuum vessel
    Ahn, H. J.
    Sa, J. W.
    Kim, Y. K.
    Hong, Y. S.
    Choi, J. H.
    Kwon, T. H.
    Lee, J. S.
    Park, K. H.
    Kim, T. S.
    Ha, W. I.
    Choi, I. S.
    Kim, B. C.
    Hong, K. H.
    Choi, C. H.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 375 - 379
  • [2] Fabrication of full-size mock-up for 10° section of ITER vacuum vessel thermal shield
    Kang, Dong Kwon
    Nam, Kwanwoo
    Kang, Kyoung-O
    Noh, Chang Hyun
    Chung, Wooho
    Lim, Kisuk
    Kang, Youngkil
    Hamlyn-Harris, Craig
    Her, Namil
    Robby, Hicks, III
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1566 - 1570
  • [3] Study on the Welding Process of the Vacuum Vessel Mock-Up for CFETR
    Liu, Zhihong
    Wu, Jiefeng
    Ma, Jianguo
    Fan, Xiaosong
    Xiu, Lei
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2018, 46 (05) : 1608 - 1611
  • [4] Fabrication of a full-size mock-up for inboard 10° section of ITER vacuum vessel thermal shield
    Chung, W.
    Nam, K.
    Noh, C. H.
    Kang, D. K.
    Kang, S. M.
    Oh, Y. G.
    Choi, S. W.
    Kang, S. H.
    Utin, Y.
    Ioki, K.
    Her, N.
    Yu, J.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) : 1928 - 1932
  • [5] A proposal of ITER vacuum vessel fabrication specification and results of the full-scale partial mock-up test
    Nakahira, M.
    Takeda, N.
    Kakudate, S.
    Onozuka, M.
    FUSION ENGINEERING AND DESIGN, 2008, 83 (10-12) : 1578 - 1582
  • [6] NUMERICAL SIMULATION OF TIG WELDING DISTORTIONS - DISTORTIONS OF A MOCK-UP REPRESENTATIVE OF ITER VACUUM VESSEL
    Pont, Denis
    Tisset, Mathieu
    Boitout, Frederic
    Gilles, Philippe
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, PVP 2011, VOL 6, A AND B, 2012, : 1523 - 1529
  • [7] Development of the ITER IOIS assembly tool and mock-up
    Nam, Kyoungo
    Kim, Dongjin
    Park, Hyunki
    Ahn, Heejae
    Kim, Kyoungkyu
    Yoo, Yongsoo
    Watson, Emma
    Shaw, Robert
    FUSION ENGINEERING AND DESIGN, 2014, 89 (9-10) : 2155 - 2158
  • [8] Development of ITER sector assembly tools and mock-up
    Nam, Kyoungo
    Park, Hyunki
    Kim, Dongjin
    Kim, Kyoungkyu
    Kim, Byungseok
    Ahn, Heejae
    Bak, Jooshik
    Im, Kihak
    Shaw, Robert
    FUSION ENGINEERING AND DESIGN, 2012, 87 (7-8) : 1268 - 1272
  • [9] Metallic Fuel Fabrication Process Development in Remote Fuel Fabrication Mock-Up at KAERI
    Kim, Kiho
    Park, Sang-Gyu
    Song, Hoon
    Park, Jeong-Yong
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2020, 2020
  • [10] ITER primary first wall mock-up fabrication and testing for Be/Cu alloy joining development
    Lorenzetto, P
    Cardella, A
    Daenner, W
    Fèbvre, M
    Ilzhoefer, A
    Richards, W
    Roedig, M
    FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 643 - 648