A proposal of ITER vacuum vessel fabrication specification and results of the full-scale partial mock-up test

被引:5
|
作者
Nakahira, M. [1 ]
Takeda, N.
Kakudate, S.
Onozuka, M. [2 ]
机构
[1] Japan Atom Energy Agcy, Div ITER Project, Naka, Ibaraki 3110193, Japan
[2] Mitsubishi Nucl Energy Syst Inc, Washington, DC 20006 USA
关键词
Vacuum vessel; ITER; Outer shell; Rib; Housing; Mock-up;
D O I
10.1016/j.fusengdes.2008.08.009
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The structure and fabrication methods of the ITER vacuum vessel (VV) have been investigated and defined by the ITER International Team (IT). However, some of the current technical specifications are difficult to be achieved from the manufacturing point of view. To solve such an issue, this paper proposes an alternative specification of the VV to the IT's design. A series of the fabrication and assembly procedures for the mock-up are presented. together with candidates of welding configurations. Finally, the paper summarizes the results of mock-up fabrication, such as non-destructive examination of weld lines, obtained welding deformation and issues revealed from the fabrication experience. Based on the results. it is suggested that several issues such as clarification of conditions of repair welding, demonstration of welding distortion control and detectability/localization of internal defects should be solved before manufacturing the ITER VV. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:1578 / 1582
页数:5
相关论文
共 30 条
  • [1] Fabrication results of full scale mock-up for ITER W port in Korea
    Kim, H. S.
    Park, C. K.
    Kim, G. H.
    Hong, K. H.
    Lee, Y. J.
    Kim, B. C.
    Ahn, H. J.
    Lee, H. G.
    Kim, T. S.
    Lee, J. S.
    Won, J. G.
    Sa, J. W.
    Choi, C. H.
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1779 - 1783
  • [2] Fabrication of full-size mock-up for 10° section of ITER vacuum vessel thermal shield
    Kang, Dong Kwon
    Nam, Kwanwoo
    Kang, Kyoung-O
    Noh, Chang Hyun
    Chung, Wooho
    Lim, Kisuk
    Kang, Youngkil
    Hamlyn-Harris, Craig
    Her, Namil
    Robby, Hicks, III
    [J]. FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1566 - 1570
  • [3] Mock-up of a support structure of the ITER vacuum vessel
    Ahn, H. J.
    Sa, J. W.
    Kim, Y. K.
    Hong, Y. S.
    Choi, J. H.
    Kwon, T. H.
    Lee, J. S.
    Park, K. H.
    Kim, T. S.
    Ha, W. I.
    Choi, I. S.
    Kim, B. C.
    Hong, K. H.
    Choi, C. H.
    [J]. FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 375 - 379
  • [4] Fabrication of full-scale sector model for ITER vacuum vessel
    Koizumi, K
    Nakahira, M
    Itou, Y
    Takahashi, H
    Tada, E
    Ioki, K
    Johnson, G
    Onozuka, M
    Utin, Y
    Sannazzaro, G
    Elio, F
    Takahashi, K
    [J]. 17TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, VOLS 1 AND 2, 1998, : 933 - 936
  • [5] Fabrication of a full-size mock-up for inboard 10° section of ITER vacuum vessel thermal shield
    Chung, W.
    Nam, K.
    Noh, C. H.
    Kang, D. K.
    Kang, S. M.
    Oh, Y. G.
    Choi, S. W.
    Kang, S. H.
    Utin, Y.
    Ioki, K.
    Her, N.
    Yu, J.
    [J]. FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) : 1928 - 1932
  • [6] Fabrication and assembly of full-scale sector models for ITER vacuum vessel
    Koizumi, K
    Nakahira, M
    Oka, K
    Itou, Y
    Takahashi, H
    Tada, E
    Ioki, K
    Johnson, G
    Onozuka, M
    Utin, Y
    Sannazzaro, G
    Elio, F
    Takahashi, K
    [J]. FUSION TECHNOLOGY, 1998, 34 (03): : 586 - 590
  • [7] Interference fit process development for the ITER Vacuum Vessel Gravity Support mock-up fabrication
    Cheon, Jason
    Park, Chulkyu
    Moon, Hokyu
    Chung, Woo-Ho
    Kim, Hyun-Soo
    Hong, Kwen-Hee
    Kim, Gwang-Ho
    Kim, Yu-Gyeong
    [J]. FUSION ENGINEERING AND DESIGN, 2019, 146 : 1907 - 1911
  • [8] Endurance test of full-scale mock-up helium circulator for HTR-PM
    Zhao, Gang
    Ye, Ping
    Wang, Hong
    Zhu, Liang
    Zhang, Qinzhao
    Wang, Jie
    Zhang, Zuoyi
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2018, 329 : 20 - 24
  • [9] Evaluation of daylight performance in scale models and a full-scale mock-up office
    Kesten, Dilay
    Fiedler, Sebastian
    Thumm, Felix
    Loeffler, Andreas
    Eicker, Ursula
    [J]. INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2010, 5 (03) : 158 - 165
  • [10] NUMERICAL SIMULATION OF TIG WELDING DISTORTIONS - DISTORTIONS OF A MOCK-UP REPRESENTATIVE OF ITER VACUUM VESSEL
    Pont, Denis
    Tisset, Mathieu
    Boitout, Frederic
    Gilles, Philippe
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, PVP 2011, VOL 6, A AND B, 2012, : 1523 - 1529