The effect of OO life cycle on software project management

被引:0
|
作者
Khan, EH [1 ]
Girgis, MR [1 ]
机构
[1] UNIV BAHRAIN,DEPT COMP SCI,ISA TOWN,BAHRAIN
关键词
D O I
10.1109/IEMC.1996.547821
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:233 / 240
页数:8
相关论文
共 50 条
  • [1] Prioritising project management competences across the software project life cycle
    Cha, Jonghyuk
    Maytorena-Sanchez, Eunice
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 12 (04) : 961 - 978
  • [2] CONTROLLING SOFTWARE LIFE-CYCLE - PROJECT-MANAGEMENT TASK
    CAVE, WC
    SALISBURY, AB
    [J]. IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 1978, 4 (04) : 326 - 334
  • [3] Renewing the Software Project Management Life Cycle guest editor's introduction
    Favaro, John
    [J]. IEEE SOFTWARE, 2010, 27 (01) : 17 - 19
  • [4] Software Project Total Life Cycle Risk Management Model Based on QFD
    Gu Xiao-yan
    Cai Chen
    [J]. 2008 INTERNATIONAL WORKSHOP ON INFORMATION TECHNOLOGY AND SECURITY, 2008, : 251 - 255
  • [5] An OO project management strategy
    Sadr, B
    Dousette, PJ
    [J]. COMPUTER, 1996, 29 (09) : 33 - &
  • [6] The Study of the Effectiveness of the Secure Software Development Life-Cycle Models in IT Project Management
    Duclervil, Saniora R.
    Liou, Jing-Chiou
    [J]. 16TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY-NEW GENERATIONS (ITNG 2019), 2019, 800 : 91 - 96
  • [7] Risk Management and the Life Cycle of the Project
    Obrova, Vladena
    Smolikova, Lenka
    [J]. CREATING GLOBAL COMPETITIVE ECONOMIES: 2020 VISION PLANNING & IMPLEMENTATION, VOLS 1-3, 2013, : 1370 - 1377
  • [8] OO project management: The need for process
    HendersonSellers, B
    [J]. IEEE SOFTWARE, 1997, 14 (04) : 96 - 97
  • [9] A simulation model for life cycle project management
    Jaafari, A
    Doloi, HK
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2002, 17 (03) : 162 - 174
  • [10] Risk factors in project management life cycle
    Karaulova, T.
    Kramarenko, S.
    Shevtshenko, E.
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE OF DAAAM BALTIC INDUSTRIAL ENGINEERING, PTS 1 AND 2, 2008, : 327 - 332