Risk-Based Decision Support for Seismic Rehabilitation of Structures

被引:4
|
作者
Park, Joonam [2 ]
Lee, Do-Hyung [3 ]
Choi, Eunsoo [1 ]
机构
[1] Hongik Univ, Dept Civil Engn, Seoul 121791, South Korea
[2] Korea Railrd Res Inst, Uiwang City 437757, South Korea
[3] PaiChai Univ, Dept Civil Environm & Railrd Engn, Taejon 302735, South Korea
关键词
seismic risk; decision support; seismic demand model; optimal rehabilitation;
D O I
10.1007/BF03249485
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study presents a risk-based decision support framework for seismic retrofit of building structures where the decision criterion is to minimize the sum of the cost required for the rehabilitation and the expected seismic loss over a specified time period. Probabilistic seismic hazard model (PSHM) and probabilistic seismic demand model (PSDM) are utilized for manipulation of the uncertainty propagation from the seismic hazard to the structural damage. A mathematical formula is then developed for probabilistic estimation of the seismic damage and losses over a specified time period. The analysis procedure is developed such that the effect of the different configurations of the decision inputs can be promptly observed. The proposed procedure is demonstrated by performing a decision analysis for a hypothetical RC building structure for determination of the optimal level of seismic rehabilitation using steel bracings.
引用
收藏
页码:107 / 114
页数:8
相关论文
共 50 条
  • [41] Decision making with risk-based weather warnings
    Mu, Di
    Kaplan, Todd R.
    Dankers, Rutger
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2018, 30 : 59 - 73
  • [42] Risk-Based Decision Methods for Vehicular Networks
    Shaikh, Riaz Ahmed
    Thayananthan, Vijey
    ELECTRONICS, 2019, 8 (06):
  • [43] Risk-Based Decision Making in IoT Systems
    Blinowski, Grzegorz J.
    INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, PT I, 2018, 655 : 230 - 241
  • [44] Risk-based decision making for dam safety
    Foster, JL
    RISK-BASED DECISION MAKING IN WATER RESOURCES VIII, 1998, : 10 - 18
  • [45] Risk-based decision making in transfusion medicine
    Bennett, Judie Leach
    Devine, Dana V.
    VOX SANGUINIS, 2018, 113 (08) : 737 - 749
  • [46] Improving risk-based communications and decision making
    Wilkinson, AJ
    JOURNAL OF PETROLEUM TECHNOLOGY, 1997, 49 (09): : 936 - +
  • [47] Dopaminergic Modulation of Risk-Based Decision Making
    St Onge, Jennifer R.
    Floresco, Stan B.
    NEUROPSYCHOPHARMACOLOGY, 2009, 34 (03) : 681 - 697
  • [48] Risk-based seismic design of base-isolated structures with single surface friction sliders
    O'Reilly, Gerard J.
    Yasumoto, Hiroshi
    Suzuki, Yoshitaka
    Calvi, Gian Michele
    Nakashima, Masayoshi
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2022, 51 (10): : 2378 - 2398
  • [49] Dopaminergic Modulation of Risk-Based Decision Making
    Jennifer R St Onge
    Stan B Floresco
    Neuropsychopharmacology, 2009, 34 : 681 - 697
  • [50] Decision & risk based design structures: Decision support needs for conceptual, concurrent design
    Meshkat, L
    Feather, MS
    INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOL 1-4, PROCEEDINGS, 2005, : 2408 - 2412