Simple Time-to-Failure Estimation Techniques for Reliability and Maintenance of Equipment

被引:10
|
作者
Penrose, Howard W. [1 ,2 ,3 ]
机构
[1] Dreisilker Elect Motors Inc, Glen Ellyn, IL 60137 USA
[2] Univ Illinois, Chicago, IL USA
[3] UIC Energy Resources Ctr, Chicago, IL USA
关键词
Reliability and maintenance; time-to-failure estimation; reactive maintenance practices; predictive maintenance practices;
D O I
10.1109/MEI.2009.5191412
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In 1979, MIT produced a report on maintenance with a focus on tribology. They estimated that $200 billion US dollars were spent on the direct costs associated with reliability and maintenance (R&M) [1]. At the time it was also estimated that over 14% of the 1979 gross domestic product (GDP) was lost opportunity due to improper R&M practices [2]. This level continued to increase as the industrial infrastructure aged, as well as other reliability-based reasons, to over 20% of the US GDP, or over $2.5 trillion in lost business opportunity [3]. This is greater than all but the top three economies in the world! At this time it is estimated that the R&M industry is approximately $1.2 trillion in size with up to $750 billion being the direct cost of breakdown maintenance (reactive) or generally poor, incorrect or excessive practices [4].The primary cause of the loss is that over 60% of maintenance programs are reactive, and the number is growing [2], which includes those programs which were initiated and later failed due to "maintenance entropy," or collapsing successful programs where the significant paybacks are no longer seen. At this time over 90% of maintenance initiatives fail, 57% of computerized maintenance management system (CMMS) applications fail, and over 93% of motor management programs fail [4]. The primary reason is that the present business mindset calls for immediate improvements, whereas it normally takes 12 to 24 months for a supported program to take hold and begin to show results - a rule of thumb that applies to all business practices. © 2009 IEEE.
引用
收藏
页码:14 / 18
页数:5
相关论文
共 50 条
  • [41] Comparison of time-to-failure of GeSi and Si bipolar transistors
    Neugroschel, A
    Sah, CT
    Ford, JM
    Steele, J
    Tang, R
    Stein, C
    IEEE ELECTRON DEVICE LETTERS, 1996, 17 (05) : 211 - 213
  • [42] Software Reliability Estimation of Gamma Failure Time Models
    Tantri, B. Roopashri
    Murulidhar, N. N.
    2016 INTERNATIONAL CONFERENCE ON SYSTEM RELIABILITY AND SCIENCE (ICSRS 2016), 2016, : 105 - 109
  • [43] USING DEGRADATION MEASURES TO ESTIMATE A TIME-TO-FAILURE DISTRIBUTION
    LU, CJ
    MEEKER, WQ
    TECHNOMETRICS, 1993, 35 (02) : 161 - 174
  • [44] Comparison of time-to-failure of GeSi and Si bipolar transistors
    Univ of Florida, Gainesville, United States
    IEEE Electron Device Lett, 5 (211-213):
  • [45] A comparison of degradation and failure-time analysis methods for estimating a time-to-failure distribution
    Lu, CJ
    Meeker, WQ
    Escobar, LA
    STATISTICA SINICA, 1996, 6 (03) : 531 - 546
  • [46] SPREAD OF TIME-TO-FAILURE MEASUREMENTS IN THIN METALLIC FILMS
    BOBBIO, A
    SARACCO, O
    THIN SOLID FILMS, 1973, 17 (01) : S13 - S16
  • [47] Selection of time-to-failure model for computerized numerical control turning center based on the assessment of trends in maintenance data
    Patil, Rajkumar Bhimgonda
    Kothavale, Basavraj S.
    Waghmode, Laxman Yadu
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2019, 233 (02) : 105 - 117
  • [48] An Accessible Way to Establish Reliability and Expected Time-to-Failure for Cold Standby Redundant Systems Subject to Periodic Inspections
    Mendes, Angelica Alebrant
    Duarte Ribeiro, Jose Luis
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2016, 32 (05) : 1663 - 1675
  • [49] Optimal Maintenance of Substation Equipment by Considering Maintenance Cost and Reliability
    Sudket, Navapol
    Chaitusaney, Surachai
    2014 11TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2014,
  • [50] Reliability Simulation and Prediction of Mechanical Equipment for Maintenance
    Huang, L. P.
    Gong, Z. L.
    Yue, W. H.
    MANUFACTURING ENGINEERING AND AUTOMATION I, PTS 1-3, 2011, 139-141 : 1060 - 1063