Simple Time-to-Failure Estimation Techniques for Reliability and Maintenance of Equipment

被引:10
|
作者
Penrose, Howard W. [1 ,2 ,3 ]
机构
[1] Dreisilker Elect Motors Inc, Glen Ellyn, IL 60137 USA
[2] Univ Illinois, Chicago, IL USA
[3] UIC Energy Resources Ctr, Chicago, IL USA
关键词
Reliability and maintenance; time-to-failure estimation; reactive maintenance practices; predictive maintenance practices;
D O I
10.1109/MEI.2009.5191412
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In 1979, MIT produced a report on maintenance with a focus on tribology. They estimated that $200 billion US dollars were spent on the direct costs associated with reliability and maintenance (R&M) [1]. At the time it was also estimated that over 14% of the 1979 gross domestic product (GDP) was lost opportunity due to improper R&M practices [2]. This level continued to increase as the industrial infrastructure aged, as well as other reliability-based reasons, to over 20% of the US GDP, or over $2.5 trillion in lost business opportunity [3]. This is greater than all but the top three economies in the world! At this time it is estimated that the R&M industry is approximately $1.2 trillion in size with up to $750 billion being the direct cost of breakdown maintenance (reactive) or generally poor, incorrect or excessive practices [4].The primary cause of the loss is that over 60% of maintenance programs are reactive, and the number is growing [2], which includes those programs which were initiated and later failed due to "maintenance entropy," or collapsing successful programs where the significant paybacks are no longer seen. At this time over 90% of maintenance initiatives fail, 57% of computerized maintenance management system (CMMS) applications fail, and over 93% of motor management programs fail [4]. The primary reason is that the present business mindset calls for immediate improvements, whereas it normally takes 12 to 24 months for a supported program to take hold and begin to show results - a rule of thumb that applies to all business practices. © 2009 IEEE.
引用
收藏
页码:14 / 18
页数:5
相关论文
共 50 条
  • [31] ERRORS IN ESTIMATING MINIMUM TIME-TO-FAILURE IN GLASS
    WILKINS, BJS
    SIMPSON, LA
    JOURNAL OF THE AMERICAN CERAMIC SOCIETY, 1974, 57 (11) : 505 - 505
  • [32] Equipment and techniques for highway maintenance
    Highways, 1994, 62 (03):
  • [33] RELIABILITY OF SYSTEMS WITH EQUIPMENT AND TIME SURPLUSES AND INSTANTANEOUS FAILURE DETECTION
    KREDENTSER, BP
    ENGINEERING CYBERNETICS, 1971, 9 (04): : 640 - +
  • [34] Belief reliability evaluation with uncertain right censored time-to-failure data under small sample situation
    Chen, Wen-Bin
    Li, Xiao-Yang
    Li, Fang-Rong
    Kang, Rui
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (06) : 3099 - 3115
  • [35] Log-periodic time-to-failure analysis
    Sornette, D
    NONDESTRUCTIVE EVALUATION OF AGING AIRCRAFT, AIRPORTS, AND AEROSPACE HARDWARE III, 1999, 3586 : 178 - 188
  • [36] Reliability models for a nonrepairable system with heterogeneous components having a phase-type time-to-failure distribution
    Kim, Heungseob
    Kim, Pansoo
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 159 : 37 - 46
  • [37] Time is money: An analysis of the time-to-failure in a flexible reorganization system
    Verreydt, Mathias
    Dewaelheyns, Nico
    Van Hulle, Cynthia
    FINANCE RESEARCH LETTERS, 2022, 46
  • [38] Reliability centred maintenance of equipment and systems
    Langli, G
    OPERATION AND MAINTENANCE OF LARGE INFRASTRUCTURE PROJECTS, 1998, : 161 - 173
  • [39] RELIABILITY AND PREDICTIVE MAINTENANCE OF DYNAMIC EQUIPMENT
    Chiribau, Ovidiu
    Ferent, Silvia
    Petrus, Rares
    Pura, Ambrozie
    Ciupan, Cornel
    ACTA TECHNICA NAPOCENSIS SERIES-APPLIED MATHEMATICS MECHANICS AND ENGINEERING, 2012, 55 (01): : 155 - 160
  • [40] Reliability Centered Maintenance of Repairable Equipment
    Maciejewski, Henryk
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON DEPENDABILITY OF COMPUTER SYSTEMS, 2009, : 332 - 339