共 50 条
- [42] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113
- [44] Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem Journal of Intelligent Manufacturing, 2009, 20 : 389 - 400
- [45] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4): : 309 - 325
- [47] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
- [48] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers The International Journal of Advanced Manufacturing Technology, 2012, 58 : 309 - 325
- [50] A clustering search metaheuristic for the bi-objective flexible job shop scheduling problem 2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 158 - 166