Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements

被引:21
|
作者
Seif, Javad [1 ]
Yu, Andrew Junfang [1 ]
Rahmanniyay, Fahimeh [1 ]
机构
[1] Univ Tennessee, Dept Ind & Syst Engn, Knoxville, TN 37996 USA
关键词
flow shop scheduling; age-based maintenance; multi-objective optimization; construction machinery management; maintenance-dependent processing time; PLANNING DECISIONS; SUPPLY CHAIN; FUZZY; ALGORITHM; NETWORK;
D O I
10.1080/00207543.2017.1403660
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In real-world problems, machines cannot continuously operate and have to stop for maintenance before they fail. Lack of maintenance can also affect the performance of machines in processing jobs. In this paper, a permutation flow shop scheduling problem with multiple age-based maintenance requirements is modelled as a novel mixed-integer linear program in which the objectives are conflicting. In modelling the problem, we assume that infrequent maintenance can prolong job processing times. One of the objectives is to minimise the total maintenance cost by planning as few maintenance activities as possible to only meet the minimum requirements, and the other objective tries to minimise the total tardiness by sequencing the jobs and planning the maintenance activities in such a way that the processing times are not prolonged and unnecessary maintenance times are avoided. Because of this conflict, an interactive fuzzy, bi-objective model is introduced. Application of the model is illustrated through a case study for operations and maintenance scheduling of heavy construction machinery. An effective and efficient solution methodology is developed based on the structure of the problem and tested against commercial solvers and a standard GA. Computational results have verified the efficiency of the proposed solution methodology and show that unlike the proposed method, a generic metaheuristic that does not consider the unique structure of the problem can become ineffective for real-world problem sizes.
引用
收藏
页码:3204 / 3225
页数:22
相关论文
共 50 条
  • [41] Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
    Berrichi, A.
    Amodeo, L.
    Yalaoui, F.
    Chatelet, E.
    Mezghiche, M.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2009, 20 (04) : 389 - 400
  • [42] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113
  • [43] Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times
    Chen, Yarong
    Guan, Zailin
    Wang, Chen
    Chou, Fuh-Der
    Yue, Lei
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (04) : 457 - 472
  • [44] Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
    A. Berrichi
    L. Amodeo
    F. Yalaoui
    E. Châtelet
    M. Mezghiche
    Journal of Intelligent Manufacturing, 2009, 20 : 389 - 400
  • [45] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers
    Abyaneh, Sina Hakimzadeh
    Zandieh, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4): : 309 - 325
  • [46] Bi-objective carbon-efficient distributed flow-shop scheduling with multistep electricity pricing
    Yu, Xianyu
    Du, Hengte
    Zhou, Dequn
    Wang, Qunwei
    Lin, Guohui
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (18) : 6842 - 6858
  • [47] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [48] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers
    Sina Hakimzadeh Abyaneh
    M. Zandieh
    The International Journal of Advanced Manufacturing Technology, 2012, 58 : 309 - 325
  • [49] Bi-objective optimisation approaches to Job-shop problem with power requirements
    Gondran, Matthieu
    Kemmoe, Sylverin
    Lamy, Damien
    Tchernev, Nikolay
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 162
  • [50] A clustering search metaheuristic for the bi-objective flexible job shop scheduling problem
    Altoe, Wagner A. S.
    Bissoli, Dayan de C.
    Mauri, Geraldo R.
    Amaral, Andre R. S.
    2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 158 - 166