共 50 条
- [33] Flexible Flow Shop Equipment Utilization Rate with Time Window Constraints Scheduling Optimization Problems [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER), 2016, : 483 - 488
- [35] A simulation-optimization approach for open-shop scheduling problem with random process times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (5-8): : 821 - 831
- [36] A simulation-optimization approach for open-shop scheduling problem with random process times [J]. The International Journal of Advanced Manufacturing Technology, 2014, 70 : 821 - 831
- [37] A testbed of simulation-optimization problems [J]. PROCEEDINGS OF THE 2006 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2006, : 255 - 263