Flexible Flow Shop Equipment Utilization Rate with Time Window Constraints Scheduling Optimization Problems

被引:0
|
作者
Han Zhonghua [1 ]
Sun Yue [2 ]
Xu Ce [2 ]
Dong Xiaoting [3 ]
Lv Zhe [2 ]
机构
[1] Shenyang Jianzhu Univ, CAS, Shenyang Inst Automat, Fac Informat & Control Engn,Dept Digital Factory, Shenyang, Peoples R China
[2] Shenyang Jianzhu Univ, Fac Informat & Control Engn, Shenyang, Peoples R China
[3] Sichuan Coll Architectural Technol, Dept Elect Engn, Deyang, Peoples R China
关键词
flexible flow shop scheduling; equipment utilization rate; time window; adaptive CGA algorithm; COMPACT GENETIC ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Towards to the utilization optimization problem of a flexible flow shop equipment with time window constraints, this paper proposed an information entropy-based adaptive CGA algorithm to solve the problem, and constructed the flexible flow shop production scheduling model with time window constraints. Global optimization procedure used adaptive CGA optimization algorithm, and simultaneously optimized online ordering and parallel station allocation. Time window constraints are used to control starting time of job during local optimization and the processing path and processing order of production jobs are determined through population designating distribution information and FIFO rule information to achieve the purpose of improving equipment utilization rate and production resources optimization. By comparing and analyzing the numerical results of the multi-group schemes, the improved adaptive CGA algorithm is proved effectiveness to solve the flexible flow shop equipment utilization rate optimization problem.
引用
收藏
页码:483 / 488
页数:6
相关论文
共 50 条
  • [1] Cyclic Scheduling of Flexible Job-shop with Time Window Constraints and Resource Capacity Constraints
    Zhang, Hongchang
    Collart-Dutilleul, Simon
    Mesghouni, Khaled
    [J]. IFAC PAPERSONLINE, 2015, 48 (03): : 816 - 821
  • [2] Scheduling optimization of flexible flow shop
    Liu, Xuefeng
    Shen, Zhenhui
    Dai, Lingmin
    [J]. PROCEEDINGS OF 2018 IEEE 4TH INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE (ITOEC 2018), 2018, : 1652 - 1657
  • [3] Flow shop scheduling problems with transportation constraints revisited
    Lan, Yan
    Yuan, Yuan
    Wang, Yinling
    Han, Xin
    Zhou, Yong
    [J]. THEORETICAL COMPUTER SCIENCE, 2024, 985
  • [4] Flow Shop Scheduling Problems with Transportation Constraints Revisited
    Yuan, Yuan
    Han, Xin
    Lan, Yan
    [J]. COMPUTING AND COMBINATORICS, COCOON 2022, 2022, 13595 : 12 - 23
  • [5] Flow shop scheduling problems with transportation and capacities constraints
    Oulamara, A
    Soukhal, A
    [J]. 2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 2540 - 2545
  • [6] Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints
    Dhouib, E.
    Teghem, J.
    Loukil, T.
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2013, 20 (02) : 213 - 232
  • [7] Flexible job-shop scheduling problems with 'AND'/'OR' precedence constraints
    Lee, Sanghyup
    Moon, Ilkyeong
    Bae, Hyerim
    Kim, Jion
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (07) : 1979 - 2001
  • [8] Complexity of flow shop scheduling problems with transportation constraints
    Soukhal, A
    Oulamara, A
    Martineau, P
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) : 32 - 41
  • [9] New formulation for scheduling flexible flow shop problems
    Esmaelian, Majid
    Mohammadi, Milad
    Shahmoradi, Hadi
    [J]. INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2023, 17 (06): : 3305 - 3319
  • [10] New formulation for scheduling flexible flow shop problems
    Majid Esmaelian
    Milad Mohammadi
    Hadi Shahmoradi
    [J]. International Journal on Interactive Design and Manufacturing (IJIDeM), 2023, 17 : 3305 - 3319