New formulation for scheduling flexible flow shop problems

被引:1
|
作者
Esmaelian, Majid [1 ]
Mohammadi, Milad [1 ]
Shahmoradi, Hadi [1 ]
机构
[1] Univ Isfahan, Dept Management, Hezarjerib St,Azadi Sq, Esfahan 7344181746, Iran
关键词
Flexible flow shop; Mixed integer linear programming; Constraint programming; Constrained vehicle routing problem; LINEAR-PROGRAMMING MODEL; HEURISTIC ALGORITHMS; 2-MACHINE FLOWSHOP; ROBOTIC FLOWSHOP; MACHINE; MINIMIZE; OPTIMIZATION; ENVIRONMENT; MAKESPAN; BLOCKING;
D O I
10.1007/s12008-023-01414-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research extends the constrained vehicle routing problem concept to solve flexible flow shop scheduling problems. Mixed-integer linear programming and constraint programming formulations are developed for a flow shop problem with no-wait, time lags and release time restrictions to minimize the makespan in both permutation and non-permutation schedules. The comparative analysis of various models reveals that constraint programming models have superior computational performance than mixed-integer linear programming models. However, the mixed-integer linear programming models are also timely-efficient. Moreover, the efficiency of developed models is also represented in comparison with several benchmark datasets. Based on the findings, while the objective function values of the mixed-integer linear programming and constraint programming models in non-permutation schedules exhibit lower values than their respective equivalents in permutation schedules, both models demonstrate longer runtime in non-permutation schedules. Results represent that the proposed constraint programming and mixed-integer linear programming models are among the top three models of the benchmark datasets in terms of the number of decision variables and computational performance. One of the limitations of the research is that there is no comprehensive dataset in the literature considering all the restrictions in permutation and non-permutation schedules.
引用
收藏
页码:3305 / 3319
页数:15
相关论文
共 50 条
  • [1] New formulation for scheduling flexible flow shop problems
    Majid Esmaelian
    Milad Mohammadi
    Hadi Shahmoradi
    [J]. International Journal on Interactive Design and Manufacturing (IJIDeM), 2023, 17 : 3305 - 3319
  • [2] Scheduling optimization of flexible flow shop
    Liu, Xuefeng
    Shen, Zhenhui
    Dai, Lingmin
    [J]. PROCEEDINGS OF 2018 IEEE 4TH INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE (ITOEC 2018), 2018, : 1652 - 1657
  • [3] A new genetic algorithm for flexible job-shop scheduling problems
    Imen Driss
    Kinza Nadia Mouss
    Assia Laggoun
    [J]. Journal of Mechanical Science and Technology, 2015, 29 : 1273 - 1281
  • [4] A new genetic algorithm for flexible job-shop scheduling problems
    Driss, Imen
    Mouss, Kinza Nadia
    Laggoun, Assia
    [J]. JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2015, 29 (03) : 1273 - 1281
  • [5] Flexible solutions in disjunctive scheduling: General formulation and study of the flow-shop case
    Aloulou, Mohamed Ali
    Artigues, Christian
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (05) : 890 - 898
  • [6] A New Hybrid Multi-Objective Scheduling Model for Hierarchical Hub and Flexible Flow Shop Problems
    Aghakhani, Sina
    Rajabi, Mohammad Sadra
    [J]. APPLIEDMATH, 2022, 2 (04): : 721 - 737
  • [7] Solving proportionate flexible flow shop scheduling problems: A column generation approach
    Shiau, DF
    Huang, YM
    [J]. PROCEEDINGS OF THE FOURTH IASTED INTERNATIONAL CONFERENCE ON MODELLING, SIMULATION, AND OPTIMIZATION, 2004, : 417 - 422
  • [8] New results for flow shop and parallel machine scheduling problems
    Chan, LMA
    Kaminsky, P
    Muriel, A
    Simchi-Levi, D
    [J]. PROCEEDINGS OF THE 1996 MSOM CONFERENCE, 1996, : 213 - 218
  • [9] Routing open shop and flow shop scheduling problems
    Yu, Wei
    Liu, Zhaohui
    Wang, Leiyang
    Fan, Tijun
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (01) : 24 - 36
  • [10] A hybrid water flow algorithm for multi-objective flexible flow shop scheduling problems
    Trung Hieu Tran
    Ng, Kien Ming
    [J]. ENGINEERING OPTIMIZATION, 2013, 45 (04) : 483 - 502