New formulation for scheduling flexible flow shop problems

被引:1
|
作者
Esmaelian, Majid [1 ]
Mohammadi, Milad [1 ]
Shahmoradi, Hadi [1 ]
机构
[1] Univ Isfahan, Dept Management, Hezarjerib St,Azadi Sq, Esfahan 7344181746, Iran
关键词
Flexible flow shop; Mixed integer linear programming; Constraint programming; Constrained vehicle routing problem; LINEAR-PROGRAMMING MODEL; HEURISTIC ALGORITHMS; 2-MACHINE FLOWSHOP; ROBOTIC FLOWSHOP; MACHINE; MINIMIZE; OPTIMIZATION; ENVIRONMENT; MAKESPAN; BLOCKING;
D O I
10.1007/s12008-023-01414-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research extends the constrained vehicle routing problem concept to solve flexible flow shop scheduling problems. Mixed-integer linear programming and constraint programming formulations are developed for a flow shop problem with no-wait, time lags and release time restrictions to minimize the makespan in both permutation and non-permutation schedules. The comparative analysis of various models reveals that constraint programming models have superior computational performance than mixed-integer linear programming models. However, the mixed-integer linear programming models are also timely-efficient. Moreover, the efficiency of developed models is also represented in comparison with several benchmark datasets. Based on the findings, while the objective function values of the mixed-integer linear programming and constraint programming models in non-permutation schedules exhibit lower values than their respective equivalents in permutation schedules, both models demonstrate longer runtime in non-permutation schedules. Results represent that the proposed constraint programming and mixed-integer linear programming models are among the top three models of the benchmark datasets in terms of the number of decision variables and computational performance. One of the limitations of the research is that there is no comprehensive dataset in the literature considering all the restrictions in permutation and non-permutation schedules.
引用
收藏
页码:3305 / 3319
页数:15
相关论文
共 50 条
  • [21] Online scheduling for hybrid flexible flow shop with Open-Shop
    Peng, Chengfeng
    Chen, Qingxin
    Mao, Ning
    Li, Zhantao
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2775 - 2787
  • [22] Survey of integrated flexible job shop scheduling problems
    Li, Xixing
    Guo, Xing
    Tang, Hongtao
    Wu, Rui
    Wang, Lei
    Pang, Shibao
    Liu, Zhengchao
    Xu, Wenxiang
    Li, Xin
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
  • [23] MULTI OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEMS
    Kaya, Serkan
    Figlali, Nilgun
    [J]. SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2013, 31 (04): : 605 - 623
  • [24] A study of lower bounds for flexible shop scheduling problems
    Vakhania, N
    Zavala, C
    [J]. 6TH WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL XI, PROCEEDINGS: COMPUTER SCIENCE II, 2002, : 268 - 273
  • [25] A genetic algorithm for flow shop scheduling problems
    Etiler, O
    Toklu, B
    Atak, M
    Wilson, J
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (08) : 830 - 835
  • [26] Flexible flow shop scheduling with uniform parallel machines
    Kyparisis, GJ
    Koulamas, C
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) : 985 - 997
  • [27] Flexible Flow Shop Scheduling Method with Public Buffer
    Han, Zhonghua
    Han, Chao
    Lin, Shuo
    Dong, Xiaoting
    Shi, Haibo
    [J]. PROCESSES, 2019, 7 (10)
  • [28] Novel Formulation and Resolution of Job-Shop Scheduling Problems
    Yan, Bing
    Bragin, Mikhail A.
    Luh, Peter B.
    [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2018, 3 (04): : 3387 - 3393
  • [29] Flexible Flow Shop Equipment Utilization Rate with Time Window Constraints Scheduling Optimization Problems
    Han Zhonghua
    Sun Yue
    Xu Ce
    Dong Xiaoting
    Lv Zhe
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON CYBER TECHNOLOGY IN AUTOMATION, CONTROL, AND INTELLIGENT SYSTEMS (CYBER), 2016, : 483 - 488
  • [30] Dynamic flexible flow shop problems-Scheduling heuristics vs. autonomous control
    Scholz-Reiter, B.
    Rekersbrink, H.
    Goerges, M.
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2010, 59 (01) : 465 - 468