An attribute management approach to concurrent engineering

被引:2
|
作者
Mileham, AR
Morgan, EJ
Chatting, I
机构
[1] Univ Bath, Dept Engn Mech, Bath BA2 7A7, Avon, England
[2] Univ Bath, Sch Management, Bath, Avon, England
关键词
concurrent engineering (CE); new product development process (PDP); attribute management; action research;
D O I
10.1243/0954405041486000
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A new approach for achieving increased concurrency in the new product development process (PDP) is discussed. It is termed an 'attribute management' approach and is based on the release of information to the next stage of the PDP on an attribute-by-attribute basis, with concurrency taking place within the development of the attribute rather than a part. For this process, an attribute is defined as a specified part or process feature that can be identified as an entity and used independently in the development or manufacture of the part. In order to validate this new approach, it has been tested in industry for the introduction of two major aerospace products, which form the basis of case studies for this paper. The results of this action research have then been compared with metrics considered typical for the introduction of these new products using a conventional concurrent engineering (CE) approach. The use of the attribute management approach, for the two cases presented, has been shown to provide significant improvements in development lead-time, development time input, recurring product cost and post-PDP design changes.
引用
收藏
页码:995 / 1003
页数:9
相关论文
共 50 条
  • [21] Transaction management for concurrent engineering design
    Mili, F
    Narayanan, K
    [J]. ADVANCES IN CONCURRENT ENGINEERING: CE97, 1997, 97 : 115 - 122
  • [22] Concurrent project management and engineering departments
    Charue-Duboc, F
    Midler, C
    [J]. SOCIOLOGIE DU TRAVAIL, 2002, 44 (03) : 401 - 417
  • [23] Work process management in concurrent engineering
    Wang, FJ
    Deng, JT
    [J]. ADVANCES IN CONCURRENT ENGINEERING: CE96: COLLABORATIVE WORK ORGANIZATION AND MANAGEMENT PRODUCT AND PROCESS INTEGRATION PLANNING AND SCHEDULING INFORMATION AND PROCESS MODELING DATA EXCHANGE PRACTICAL APPLICATIONS, 1996, 96 : 287 - 294
  • [24] A concurrent engineering approach to design for assembly
    Wu, T
    O'Grady, P
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1999, 7 (03): : 231 - 243
  • [25] Concurrent engineering approach to product documentation
    Pham, DT
    Dimov, SS
    Setchi, RM
    [J]. ADVANCES IN MANUFACTURING TECHNOLOGY - XIII, 1999, : 389 - 393
  • [26] Lean Approach in Concurrent Engineering Applications
    Karademir, Senay
    Cangelir, Can
    [J]. 20TH ISPE INTERNATIONAL CONFERENCE ON CONCURRENT ENGINEERING, 2013, : 190 - 197
  • [27] A modeling approach to logistics in concurrent engineering
    Dowlatshahi, S
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (01) : 59 - 76
  • [28] Concurrent Engineering Systematic Approach and Application
    熊光楞
    张玉云
    [J]. Tsinghua Science and Technology, 1996, (02) : 185 - 192
  • [29] A new approach to transmission concurrent engineering
    James, B
    Poon, P
    Lack, L
    [J]. AEROSPACE TRANSMISSION SYSTEMS - CONCURRENT DESIGN AND MANUFACTURE, 1998, 1998 (06): : 21 - 33
  • [30] A HIERARCHICAL APPROACH TO CONCURRENT ENGINEERING SYSTEMS
    OGRADY, PJ
    KIM, Y
    YOUNG, RE
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1994, 7 (03) : 152 - 162