A concurrent engineering approach to design for assembly

被引:14
|
作者
Wu, T [1 ]
O'Grady, P [1 ]
机构
[1] Univ Iowa, Dept Ind Engn, Iowa City, IA 52242 USA
来源
关键词
concurrent engineering; design for assembly; design for manufacturing; Petri Nets; cost; lead time;
D O I
10.1177/1063293X9900700305
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
DFA (Design for Assembly) is important in that it potentially can reduce the estimated 15-70% of manufacturing cost that is attributable to assembly. Besides the reduction in cost, DFA promises additional benefits in increased quality, increased reliability, and shorter manufacturing time. While there has been considerable interest in DFA, the research that has been reported in this area tends to suffer from a considerable handicap, namely that the work reported focuses primarily on DFA, without taking the other Concurrent Engineering (CE) aspects associated with the product fully into account. Therefore it is quite possible, for example, to use DFA approaches to redesign a product so that it is a good design from the perspective of assembly but where the redesign is difficult, time consuming or expensive to manufacture or test. Part of the difficulty in including perspectives, other than that of assembly, is the resulting complexity caused by the multitude of different considerations that have to be taken into account. This paper aims to address this problem by developing a methodology that models the different considerations as an abstracted network, called a CE-Nets. The CE-Nets, a variant of Petri Nets, only uses that information which is pertinent to DFA and therefore substantially reduces the problem of complexity. The basis of CE-Nets is described in the paper and an example is given. The CE-Nets approach offers three main potential advantages. First, it offers the potential of including other CE perspectives in a DFA system, without undue complexity. Second, it is a graphical approach that allows users to examine the interaction between different considerations. Third, it applies a mathematical mechanism to the problem, with the potential of being relatively straightforward to computerize.
引用
收藏
页码:231 / 243
页数:13
相关论文
共 50 条
  • [1] Effects of product design on assembly lines performances: a concurrent engineering approach
    Caputo, Antonio C.
    Pelagagge, Pacifico M.
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2008, 108 (5-6) : 726 - 749
  • [2] Design tolerance suitable for manufacturing and assembly in concurrent engineering
    Ikonomov, PG
    Fukuda, S
    [J]. ADVANCES IN CONCURRENT ENGINEERING: CE99, 1999, 99 : 405 - 413
  • [3] A concurrent engineering approach to chemical process design
    Herder, PM
    Weijnen, MPC
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) : 311 - 318
  • [4] Design for disassembly and recyclability: A concurrent engineering approach
    Wang, MH
    Johnson, MR
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1995, 3 (02): : 131 - 134
  • [5] A concurrent engineering approach for product design optimization
    Seif, MA
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1998, 6 (02): : 101 - 110
  • [6] A scheduling approach for design activities in concurrent engineering
    Yan, JH
    Wu, C
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2001, 31 (03): : 361 - 365
  • [7] Concurrent engineering environment for product design, assembly and resource planning
    Delchambre, A
    Fan, IS
    Wafflard, A
    Falkenauer, E
    [J]. FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING 1996, 1996, : 322 - 331
  • [8] Design for control - A concurrent engineering approach for mechatronic systems design
    Li, Q
    Zhang, WJ
    Chen, L
    [J]. IEEE-ASME TRANSACTIONS ON MECHATRONICS, 2001, 6 (02) : 161 - 169
  • [9] Assembly model for concurrent engineering
    Hou, XL
    Zhang, SS
    [J]. FOURTH INTERNATIONAL CONFERENCE ON COMPUTER-AIDED DESIGN AND COMPUTER GRAPHICS, 1996, 2644 : 665 - 670
  • [10] Concurrent engineering approach to reducing design delivery time
    Bogus, SM
    Molenaar, KR
    Diekmann, JE
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (11): : 1179 - 1185