A new model for the Replacement Priority Value of medical equipment

被引:0
|
作者
Caimmi, C [1 ]
Bocchieri, A [1 ]
Buizza, A [1 ]
Genduso, G [1 ]
机构
[1] Univ Pavia, Dipartimento Informat & Sistemist, I-27100 Pavia, Italy
关键词
D O I
暂无
中图分类号
R318 [生物医学工程];
学科分类号
0831 ;
摘要
A simple model has been defined aimed at computing the so-called Replacement Priority Value (RPV) of medical equipment. With respect to the well-known model by Fennigkoh (1992), RPV is computed in two steps, of which the second one concerns only the instruments selected as critical in the first one. Also the attributes considered by the model and their weight factors have been modified with respect to the Fennigkoh's model, in order to adapt model behaviour to the specific context where it is to be applied. When tested on a sample of 31 medical devices, the model was easy to use and its recommendations showed "good sense". Such a kind of quantitative tools may greatly help the hospital top management in planning equipment replacement policy.
引用
收藏
页码:183 / 186
页数:4
相关论文
共 50 条
  • [41] ON MEDICAL PRIORITY
    KLEIN, R
    NEW ENGLAND JOURNAL OF MEDICINE, 1969, 281 (19): : 1073 - &
  • [42] A Method to Identify New Needs for Medical Equipment
    Hiram Castro-Orozco, N.
    Fernanda Pina-Quintero, M.
    Ortiz-Posadas, Martha R.
    2021 43RD ANNUAL INTERNATIONAL CONFERENCE OF THE IEEE ENGINEERING IN MEDICINE & BIOLOGY SOCIETY (EMBC), 2021, : 1345 - 1348
  • [43] Testing new alarms for medical electrical equipment
    Wee, A
    Sanderson, P
    HUMAN-COMPUTER INTERACTION - INTERACT 2005, PROCEEDINGS, 2005, 3585 : 1146 - 1149
  • [44] Technical and economic aspects of the new replacement value of the yardstick competition model in distribution regulation
    Bedriñana, MF
    Paucar, VL
    POWERCON 2002: INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS 1-4, PROCEEDINGS, 2002, : 2674 - 2679
  • [45] INFORMATION PRIVACY PROTECTION IN THE NEW CHINESE CIVIL CODE: PRIORITY OR REPLACEMENT?
    Li Xiaohui
    FRONTIERS OF LAW IN CHINA, 2020, 15 (03) : 313 - 338
  • [46] OPTIMIZATION MODEL FOR VEHICLE ROUTING AND EQUIPMENT REPLACEMENT IN FARM MACHINERY
    Grano, Carolina
    Abensur, Eder
    ENGENHARIA AGRICOLA, 2017, 37 (05): : 987 - 993
  • [47] Decision-Making Framework for Medical Equipment Maintenance and Replacement in Private Hospitals
    Salim, Siti Hajar
    Salim, Siti Aisyah
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (03): : 320 - 338
  • [48] Medical Equipment Replacement Prioritisation: A Comparison Between Linear and Fuzzy System Models
    Maggi, Norbert
    Adornetto, Antonella
    Scillieri, Stefano
    Urbina, Ezio Nicholas Bruno
    Ruggiero, Carmelina
    Giacomini, Mauro
    MEDINFO 2019: HEALTH AND WELLBEING E-NETWORKS FOR ALL, 2019, 264 : 1538 - 1539
  • [49] On the value function of a priority queue with an application to a controlled polling model
    Ger Koole
    Philippe Nain
    Queueing Systems, 2000, 34 : 199 - 214
  • [50] Plantwide replacement of the existing control equipment by a new DCS at AOS
    Ruester, Joerg
    Arpe, Rolf
    Grotheer, Holger
    LIGHT METALS 2006, VOL 1: ALUMINA & BAUXITE, 2006, : 139 - +