A new model for the Replacement Priority Value of medical equipment

被引:0
|
作者
Caimmi, C [1 ]
Bocchieri, A [1 ]
Buizza, A [1 ]
Genduso, G [1 ]
机构
[1] Univ Pavia, Dipartimento Informat & Sistemist, I-27100 Pavia, Italy
关键词
D O I
暂无
中图分类号
R318 [生物医学工程];
学科分类号
0831 ;
摘要
A simple model has been defined aimed at computing the so-called Replacement Priority Value (RPV) of medical equipment. With respect to the well-known model by Fennigkoh (1992), RPV is computed in two steps, of which the second one concerns only the instruments selected as critical in the first one. Also the attributes considered by the model and their weight factors have been modified with respect to the Fennigkoh's model, in order to adapt model behaviour to the specific context where it is to be applied. When tested on a sample of 31 medical devices, the model was easy to use and its recommendations showed "good sense". Such a kind of quantitative tools may greatly help the hospital top management in planning equipment replacement policy.
引用
收藏
页码:183 / 186
页数:4
相关论文
共 50 条
  • [21] SIMULATION MODEL FOR COMPUTING EQUIPMENT REPLACEMENT.
    Ballot, Michael
    Simulation Councils Proceedings Series, 1981, 9 (01): : 59 - 68
  • [22] Compromise Solution in an Economy Model with Replacement of Equipment
    Malafeev O.A.
    Parfenov A.P.
    Journal of Mathematical Sciences, 2022, 263 (5) : 720 - 734
  • [24] Development of Methodology of Evaluation for Medical Equipment Replacement for Developing Countries
    Andres Alvarado, Mario
    Luz Rocha, Sandra
    WORLD CONGRESS ON MEDICAL PHYSICS AND BIOMEDICAL ENGINEERING 2018, VOL 3, 2019, 68 (03): : 383 - 386
  • [25] Markov chain optimization of repair and replacement decisions of medical equipment
    Liao, Hao-yu
    Cade, Willie
    Behdad, Sara
    RESOURCES CONSERVATION AND RECYCLING, 2021, 171
  • [26] Development of an automated medical equipment replacement planning system in hospitals
    Rajasekaran, D
    2005 IEEE 31ST ANNUAL NORTHEAST BIOENGINEERING CONFERENCE, 2005, : 52 - 53
  • [27] Optimization of medical equipment replacement using deterministic dynamic programming
    Altalabi, W.
    Rushdi, M.
    Tawfik, B.
    Journal of Engineering and Applied Science, 2020, 67 (02): : 467 - 486
  • [28] Complicated equipment cost estimation model with similarity information priority
    Wu, Li-Feng, 2024, Chinese Institute of Electronics (36):
  • [29] A New Method of Medical Equipment Sterilization
    Atalay, Hesna Ozbek Ulkutas
    Ozcelik, Berrin
    Guler, Inan
    2022 MEDICAL TECHNOLOGIES CONGRESS (TIPTEKNO'22), 2022,
  • [30] Capital equipment replacement model for a fleet with variable size
    Scarf, P.A.
    Bouamra, O.
    Journal of Quality in Maintenance Engineering, 1999, 5 (01): : 40 - 49