QUANTITATIVE RISK ASSESSMENT FOR PROJECTS SCHEDULES

被引:0
|
作者
Hassanien, Sherif S. [1 ]
Skow, Jason B. [1 ]
机构
[1] C FER Technol, Edmonton, AB, Canada
关键词
CONSTRUCTION; PRODUCTIVITY; MODEL; PERFORMANCE;
D O I
暂无
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Despite vigilant efforts in project scheduling and planning by engineers and project managers, recent market research reported a marked decrease in project success rates. The market research tracked projects across a broad range of industries and concluded the primary failure causes to be a lack of sufficient detail in the project planning stage, poor or no risk analysis, scope creep and poor communication. This paper focuses on a strategy to minimize the first cause. Specifically, how to obtain sufficient schedule and resource estimates to better predict time allocation and expected costs with a focus on capital pipeline projects. To this end, a quantitative risk assessment (QRA) methodology is applied to project schedules allowing the uncertainty of key task durations and/or costs to be fully accounted for in the schedule. Projects managers will be able to quantify the uncertainty in their projects and support decision makers with a more accurate prediction of the likelihood of being on time and on budget. This paper introduces a systematic approach for both aleatory and epistemic uncertainty quantification. In addition, the expected benefits of adopting QRA for projects schedules are discussed through a hypothetical simple project schedule from the pipeline industry.
引用
收藏
页码:61 / 67
页数:7
相关论文
共 50 条
  • [21] QUANTITATIVE RISK ASSESSMENT
    PORTIER, CJ
    [J]. ACS SYMPOSIUM SERIES, 1989, 414 : 164 - 174
  • [22] Quantitative risk management for energy retrofit projects
    Heo, Yeonsook
    Augenbroe, Godfried
    Choudhary, Ruchi
    [J]. JOURNAL OF BUILDING PERFORMANCE SIMULATION, 2013, 6 (04) : 257 - 268
  • [23] Improving Quantitative Assessment of Political Risk in International Construction Projects: The Case of Chinese Construction Companies
    Chang, Tengyuan
    Deng, Xiaopeng
    Hwang, Bon-Gang
    Zhao, Xiaojing
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (12)
  • [24] RISK ASSESSMENT OF THE INNOVATIVE PROJECTS IMPLEMENTATION
    Deptula, Anna Malgorzata
    Knosala, Ryszard
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2015, 6 (04) : 15 - 25
  • [25] Risk assessment for industrial deleading projects
    Adley, Daniel P.
    [J]. Journal of Protective Coatings & Linings, 1996, 13 (02):
  • [26] Risk Assessment for International EPC Projects
    Yang, Jing-nan
    Cai, Wei-ning
    Fang, Wei-guo
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2014), 2015, : 143 - 148
  • [27] Risk assessment in construction projects of Iraq
    Alklkali, Ali Moosa Taqi
    [J]. JOURNAL OF ALGEBRAIC STATISTICS, 2022, 13 (01) : 517 - 525
  • [28] Qualitative assessment of risk on large projects
    Brush, D
    [J]. JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2005, 131 (04) : 281 - 283
  • [29] A quantitative sustainability assessment framework for petroleum refinery projects
    Hasheminasab, Hamidreza
    Gholipour, Yaghob
    Kharrazi, Mohammadreza
    Streimikiene, Dalia
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (12) : 15305 - 15319
  • [30] NEW APPROACHES TO THE QUANTITATIVE ASSESSMENT OF THE NEED FOR INVESTMENT PROJECTS
    Dobrea, Razvan Catalin
    Pacurari, Marius
    Albu, Eugen
    [J]. PROCEEDINGS OF THE 11TH INTERNATIONAL MANAGEMENT CONFERENCE: THE ROLE OF MANAGEMENT IN THE ECONOMIC PARADIGM OF THE XXIST CENTURY (IMC 2017), 2017, : 1070 - 1076