Improving Quantitative Assessment of Political Risk in International Construction Projects: The Case of Chinese Construction Companies

被引:26
|
作者
Chang, Tengyuan [1 ]
Deng, Xiaopeng [1 ]
Hwang, Bon-Gang [2 ]
Zhao, Xiaojing [3 ]
机构
[1] Southeast Univ, Sch Civil Engn, Nanjing 210096, Jiangsu, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, 4 Architecture Dr, Singapore 117566, Singapore
[3] Beijing Inst Technol, Sch Econ & Management, Beijing 10008, Peoples R China
基金
中国国家自然科学基金;
关键词
Political risk; International construction project; Risk assessment; Vulnerability; Cannikin law; MODEL; INSTITUTIONS; INSTABILITY; INVESTMENT; MANAGEMENT; FIRMS;
D O I
10.1061/(ASCE)CO.1943-7862.0001738
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Political risk is one of the most prominent dangers for International Construction Companies (ICCs) to deal with in overseas countries. Despite considerable studies on political risk management in international business, few have been focused on quantitative political risk assessment methods in international construction projects. Thus, this study aims to establish a quantitative model for assessing political risk in such projects. Through the comprehensive literature review and the pilot interviews with 10 industry experts, 36 political risk source variables were first identified. Then, a questionnaire survey was conducted with 155 respondents, and a confirmatory factor analysis (CFA) was performed to group these variables into six exogenous driver components and six endogenous vulnerability components. Subsequently, a quantitative assessment model was developed, based on the vulnerability theory and the Cannikin Law, and validated by 294 cases obtained from 45 Chinese Construction Companies (CCCs). This study incorporated the vulnerability variables and the Cannikin Law in political risk assessment and provides ICCs with a more effective approach to assess political risk using the available data from international research institutes and project systems. The application of the model can also facilitate in political risk warning and management in the international construction business. As the model proposed in this study can be applied to ICCs in different countries, the findings and outcomes of this study can contribute to the global body of knowledge of political risk management.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Political Risk Paths in International Construction Projects: Case Study from Chinese Construction Enterprises
    Chang, Tengyuan
    Deng, Xiaopeng
    Hwang, Bon-Gang
    Zhao, Xiaojing
    [J]. ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [2] Risk Paths in International Construction Projects: Case Study from Chinese Contractors
    Liu, Junying
    Zhao, Xianbo
    Yan, Peng
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (06)
  • [3] Project System Vulnerability to Political Risks in International Construction Projects: The Case of Chinese Contractors
    Deng, Xiaopeng
    Pheng, Low Sui
    Zhao, Xianbo
    [J]. PROJECT MANAGEMENT JOURNAL, 2014, 45 (02) : 20 - 33
  • [4] Identifying Political Risk Management Strategies in International Construction Projects
    Chang, Tengyuan
    Hwang, Bon-Gang
    Deng, Xiaopeng
    Zhao, Xianbo
    [J]. ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [5] Exploring Critical Variables That Affect Political Risk Level in International Construction Projects: Case Study from Chinese Contractors
    Deng, Xiaopeng
    Low, Sui Pheng
    [J]. JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2014, 140 (01)
  • [6] Improving the assessment of the diversification of construction companies
    Ginevičius, Romualdas
    [J]. Engineering Management in Production and Services, 2023, 15 (02) : 46 - 54
  • [7] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46
  • [8] Enhancing Risk Management by Partnering in International EPC Projects: Perspective from Evolutionary Game in Chinese Construction Companies
    Yang, Yujing
    Tang, Wenzhe
    Shen, Wenxin
    Wang, Tengfei
    [J]. SUSTAINABILITY, 2019, 11 (19)
  • [9] Quantitative Risk Assessment of Cut-Slope Projects under Construction
    Li, Zhihong
    Huang, Hongwei
    Nadim, Farrokh
    Xue, Yadong
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2010, 136 (12) : 1644 - 1654
  • [10] Assessment of and Countermeasures against International Political Risk for Chinese Oil Companies
    Ma Hong1 and Sun Zhu2 (1. Beijing Electronic Science and Technology Institute
    [J]. Petroleum Science, 2006, (04) : 78 - 81