Quantitative Risk Assessment of Cut-Slope Projects under Construction

被引:18
|
作者
Li, Zhihong [1 ,2 ]
Huang, Hongwei [1 ]
Nadim, Farrokh [2 ]
Xue, Yadong [1 ]
机构
[1] Tongji Univ, Dept Geotech Engn, Shanghai 200092, Peoples R China
[2] Norwegian Geotech Inst, Int Ctr Geohazards, Oslo, Norway
关键词
Quantitative analysis; Assessment; Risk management; Landslides; Construction; MANAGEMENT; HAZARD; MODEL;
D O I
10.1061/(ASCE)GT.1943-5606.0000381
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In some cut-slope projects landslide is a common problem during construction due to unfavorable geomorphological and geomechanical conditions. It is necessary to do a quantitative assessment of the risk posed by landslide before determining the budget or tender price. This paper outlines a general procedure for doing this, followed by an example to demonstrate the approach in comparison to a known failure. Finite-element analyses identify the most dangerous landslide scenario among all construction steps. The slope failure probability is then estimated using reliability theory based on the most dangerous construction step. After identifying the potential failure surface and estimating the volume of the sliding mass, the runnout behavior of sliding mass is simulated to delimit the extent of likely impacted area. Then, the exposed elements at risk and their vulnerabilities are identified and analyzed. The landslide risk is assessed quantitatively for three types of consequences: casualties, economic loss, and time overrun. Compared with actual consequences, the estimation results were in acceptable agreement with the case study. The paper demonstrates that it is feasible to analyze the risk associated with landslides during construction of cut-slopes.
引用
收藏
页码:1644 / 1654
页数:11
相关论文
共 50 条
  • [1] Assessment of landslide hazard of a cut-slope using linear regression analysis
    Jamaludin, S.
    Huat, B. B. K.
    Omar, H.
    [J]. LANDSLIDES AND ENGINEERED SLOPES: FROM THE PAST TO THE FUTURE, VOLS 1 AND 2, 2008, : 1919 - 1924
  • [2] Traffic interruption risk induced by cut-slope failure: The rainfall effect
    Jimenez-Ramos, Gustavo
    Echaveguren, Tomas
    Vargas-Baecheler, Jose
    Chamorro, Alondra
    [J]. TRANSPORTATION GEOTECHNICS, 2023, 41
  • [3] Loess erosion patterns on a cut-slope revealed by LiDAR scanning
    Li, Langping
    Lan, Hengxing
    Peng, Jianbing
    [J]. ENGINEERING GEOLOGY, 2020, 268
  • [4] Revegetation of an artificial cut-slope by seeds dispersed from the surrounding vegetation
    Daisuke Hosogi
    Chiemi Yoshinaga
    Katsue Nakamura
    Akira Kameyama
    [J]. Landscape and Ecological Engineering, 2006, 2 (1) : 53 - 63
  • [5] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46
  • [6] The repeated failure of a cut-slope despite continuous reassessment and remedial works
    Lee, Su-Gon
    Hencher, Steve-Raymond
    [J]. ENGINEERING GEOLOGY, 2009, 107 (1-2) : 16 - 41
  • [7] Dynamics of plant ecology and soil conservation: Implications for cut-slope protection
    Osman, Normaniza
    Dorairaj, Deivaseeno
    Halim, Aimee
    Abu Zelan, Nurul Izzaty
    Rashid, Muhammad Afiq Abdul
    Zakaria, Rozainah Mohd
    [J]. ACTA OECOLOGICA-INTERNATIONAL JOURNAL OF ECOLOGY, 2021, 111
  • [8] Case Study of Assessment of Reoccurring Failures in a High Plasticity Soil Cut-Slope and the Importance of Timely Stabilization
    Lee, Yonghoon
    [J]. IFCEE 2024: EARTH RETAINING SYSTEMS, GROUND IMPROVEMENT, AND SEEPAGE CONTROL, 2024, 355 : 400 - 413
  • [9] Cut-slope versus shallow tunnel: Risk-based decision making framework for alternative selection
    Li, Zhihong
    Huang, Hongwei
    Xue, Yadong
    [J]. ENGINEERING GEOLOGY, 2014, 176 : 11 - 23
  • [10] Designing and numerical simulations of aufeis mitigation structure on cut-slope roadway
    Lu, Yan
    Yu, Wenbing
    Yi, Xin
    Han, Fenglei
    Chen, Lin
    [J]. COLD REGIONS SCIENCE AND TECHNOLOGY, 2017, 141 : 201 - 208