Quantitative Risk Assessment of Cut-Slope Projects under Construction

被引:19
|
作者
Li, Zhihong [1 ,2 ]
Huang, Hongwei [1 ]
Nadim, Farrokh [2 ]
Xue, Yadong [1 ]
机构
[1] Tongji Univ, Dept Geotech Engn, Shanghai 200092, Peoples R China
[2] Norwegian Geotech Inst, Int Ctr Geohazards, Oslo, Norway
关键词
Quantitative analysis; Assessment; Risk management; Landslides; Construction; MANAGEMENT; HAZARD; MODEL;
D O I
10.1061/(ASCE)GT.1943-5606.0000381
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In some cut-slope projects landslide is a common problem during construction due to unfavorable geomorphological and geomechanical conditions. It is necessary to do a quantitative assessment of the risk posed by landslide before determining the budget or tender price. This paper outlines a general procedure for doing this, followed by an example to demonstrate the approach in comparison to a known failure. Finite-element analyses identify the most dangerous landslide scenario among all construction steps. The slope failure probability is then estimated using reliability theory based on the most dangerous construction step. After identifying the potential failure surface and estimating the volume of the sliding mass, the runnout behavior of sliding mass is simulated to delimit the extent of likely impacted area. Then, the exposed elements at risk and their vulnerabilities are identified and analyzed. The landslide risk is assessed quantitatively for three types of consequences: casualties, economic loss, and time overrun. Compared with actual consequences, the estimation results were in acceptable agreement with the case study. The paper demonstrates that it is feasible to analyze the risk associated with landslides during construction of cut-slopes.
引用
收藏
页码:1644 / 1654
页数:11
相关论文
共 50 条
  • [41] Risk assessment for construction projects of transport infrastructure objects
    Titarenko, Boris
    ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [42] Risk-Informed Performance Assessment of Construction Projects
    Papanikolaou, Merkourios
    Xenidis, Yiannis
    SUSTAINABILITY, 2020, 12 (13)
  • [43] Risk Assessment of Construction Organization Plans for Bridge Projects
    Wang, Yuqian
    Bian, Guoyan
    Li, Yi
    ADVANCES IN CIVIL ENGINEERING AND BUILDING MATERIALS III, 2014, 831 : 370 - +
  • [44] Risk Assessment and Allocation in Highway Construction Projects in the UAE
    El-Sayegh, Sameh M.
    Mansour, Mahmoud H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [45] Structural Network Measures for Risk Assessment of Construction Projects
    Govan, Paul
    Damnjanovic, Ivan
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2020, 6 (01)
  • [46] Risk identification and assessment in sustainable construction projects in the UAE
    El-Sayegh, Sameh M.
    Manjikian, Solair
    Ibrahim, Ahmed
    Abouelyousr, Ahmed
    Jabbour, Raed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (04) : 327 - 336
  • [47] ENTERPRISE'S RISK ASSESSMENT OF COMPLEX CONSTRUCTION PROJECTS
    Konior, J.
    ARCHIVES OF CIVIL ENGINEERING, 2015, 61 (03) : 63 - 74
  • [48] A REVIEW OF FUZZY RISK ASSESSMENT MODELS FOR CONSTRUCTION PROJECTS
    Rezakhani, P.
    SLOVAK JOURNAL OF CIVIL ENGINEERING, 2012, 20 (03) : 35 - 40
  • [49] An expert system for risk assessment tools of construction projects
    Yang, ZH
    Zhou, C
    Zhang, ZY
    Zhao, JP
    Guo, JP
    Cui, XH
    Dong, JH
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL III, PTS A AND B, 2002, 3 : 1013 - 1016
  • [50] Identification and initial risk assessment of construction projects in Poland
    Skorupka, Dariusz
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2008, 24 (03) : 120 - 127