QUANTITATIVE RISK ASSESSMENT FOR PROJECTS SCHEDULES

被引:0
|
作者
Hassanien, Sherif S. [1 ]
Skow, Jason B. [1 ]
机构
[1] C FER Technol, Edmonton, AB, Canada
关键词
CONSTRUCTION; PRODUCTIVITY; MODEL; PERFORMANCE;
D O I
暂无
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Despite vigilant efforts in project scheduling and planning by engineers and project managers, recent market research reported a marked decrease in project success rates. The market research tracked projects across a broad range of industries and concluded the primary failure causes to be a lack of sufficient detail in the project planning stage, poor or no risk analysis, scope creep and poor communication. This paper focuses on a strategy to minimize the first cause. Specifically, how to obtain sufficient schedule and resource estimates to better predict time allocation and expected costs with a focus on capital pipeline projects. To this end, a quantitative risk assessment (QRA) methodology is applied to project schedules allowing the uncertainty of key task durations and/or costs to be fully accounted for in the schedule. Projects managers will be able to quantify the uncertainty in their projects and support decision makers with a more accurate prediction of the likelihood of being on time and on budget. This paper introduces a systematic approach for both aleatory and epistemic uncertainty quantification. In addition, the expected benefits of adopting QRA for projects schedules are discussed through a hypothetical simple project schedule from the pipeline industry.
引用
收藏
页码:61 / 67
页数:7
相关论文
共 50 条
  • [1] ON QUANTITATIVE RISK ASSESSMENT OF INFRASTRUCTURAL PROJECTS WITH STATE PARTICIPATION
    Belyakov, Igor, V
    [J]. VOPROSY GOSUDARSTVENNOGO I MUNITSIPALNOGO UPRAVLENIYA-PUBLIC ADMINISTRATION ISSUES, 2022, (04): : 30 - 60
  • [2] Quantitative risk assessment and the effective management of software projects
    Shoemaker, D
    Drommi, A
    Norfleet, W
    [J]. ISSUES AND TRENDS OF INFORMATION TECHNOLOGY MANAGEMENT IN CONTEMPORARY ORGANIZATIONS, VOLS 1 AND 2, 2002, : 754 - 757
  • [3] MODERN INSTRUMENTS OF QUANTITATIVE RISK ANALYSIS AND RISK ASSESSMENT OF INNOVATION PROJECTS
    Privalov, N. G.
    Kozlovsky, A. N.
    Petrov, V. N.
    [J]. JOURNAL OF MINING INSTITUTE, 2012, 197 : 107 - 112
  • [4] Analytical approach to quantitative risk assessment for solar power projects
    Guindon, A-A.
    Wright, D. J.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2020, 133
  • [5] Risk assessment in construction schedules
    Mulholland, B
    Christian, J
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (01) : 8 - 15
  • [6] Quantitative Risk Assessment of Cut-Slope Projects under Construction
    Li, Zhihong
    Huang, Hongwei
    Nadim, Farrokh
    Xue, Yadong
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2010, 136 (12) : 1644 - 1654
  • [7] Quantitative lean assessment of line of balance schedules' quality
    Ungureanu, Lucian Constantin
    Hartmann, Timo
    Serbanoiu, Ion
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (02) : 224 - 244
  • [8] Risk Assessment In Research Projects
    Schmidt, Roland
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2010 PROCEEDINGS, 2010,
  • [9] Risk assessment in ERP projects
    Aloini, Davide
    Dulmin, Riccardo
    Mininno, Valeria
    [J]. INFORMATION SYSTEMS, 2012, 37 (03) : 183 - 199
  • [10] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46