共 50 条
- [1] Initiation and Arrest of Delayed Hydride Cracking in Zr-2.5Nb Tubes [J]. JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2009, 131 (01):
- [3] AN EXTENDED PROCESS-ZONE MODELING FRAMEWORK FOR OVERLOAD CRACK INITIATION IN ZR-2.5NB PRESSURE TUBES [J]. PROCEEDINGS OF ASME 2022 PRESSURE VESSELS AND PIPING CONFERENCE, PVP2022, VOL 1, 2022,
- [5] Delayed Hydride Cracking Initiation at Notches in Zr-2.5Nb Alloys [J]. JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2009, 131 (04):
- [8] Temperature dependency of delayed hydride cracking velocity in Zr-2.5Nb tubes [J]. MATERIALS SCIENCE AND ENGINEERING A-STRUCTURAL MATERIALS PROPERTIES MICROSTRUCTURE AND PROCESSING, 2007, 468 : 281 - 287
- [10] EFFECT OF FLAW ORIENTATION ON DELAYED HYDRIDE CRACK INITIATION IN ZR-2.5NB PRESSURE TUBES [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2013, VOL 6A: MATERIALS AND FABRICATION, 2014,