VALIDATION OF WEIGHT FUNCTION BASED PROCESS-ZONE MODEL FOR EVALUATION OF DELAYED HYDRIDE CRACKING INITIATION IN ZR-2.5NB PRESSURE TUBES

被引:0
|
作者
Xu, Steven X. [1 ]
Kawa, Dennis [2 ]
Cui, Jun [1 ]
Chaput, Heather [3 ]
机构
[1] Kinectrics Inc, 800 Kipling Ave, Toronto, ON M8Z 5G5, Canada
[2] Kedward Kawa & Associates Ltd, 122 Valleyview Dr, Winnipeg, MB M2Y 0R8, Canada
[3] Canadian Nucl Labs, 286 Plant Rd, Chalk River, ON K0J 1J0, Canada
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In-service flaws in cold-worked Zr-2.5 Nb pressure tubes in CANDUW reactors are susceptible to a phenomenon known as delayed hydride cracking (DHC). The material is susceptible to DHC when there is diffusion of hydrogen atoms to a service-induced flaw, precipitation of hydrides on appropriately oriented crystallographic planes in the zirconium alloy matrix material, and development of a hydrided region at the flaw tip. The hydrided region could then fracture to the extent that a crack forms and DHC is said to have initiated. Examples of in-service flaws are fuel bundle scratches, crevice corrosion marks, fuel bundle bearing pad fretting flaws, and debris fretting flaws. These flaws are volumetric in nature. Evaluation of DHC initiation from the flaw is a requirement of Canadian Standards Association (CSA) Standard N285.8. This paper describes the validation of the weight function based process zone model for evaluation of pressure tube flaws for DHC initiation. Validation was performed by comparing the predicted threshold load levels for DHC initiation with the results from DHC initiation experiments on small notched specimens. The notches in the specimens simulate axial in-service flaws in the pressure tube. The validation was performed for both un-irradiated and pre-irradiated pressure tube material.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Crack initiation by delayed hydride cracking at sharp notches in Zr-2.5 NB alloys
    Sagat, S
    Newman, GW
    Scarth, DA
    [J]. HYDROGEN EFFECTS ON MATERIAL BEHAVIOR AND CORROSION DEFORMATION INTERACTIONS, 2003, : 289 - 299
  • [42] Influence of metallurgical variables on delayed hydride cracking in Zr-Nb pressure tubes
    Domizzi, G.
    Haddad, R.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2008, 374 (1-2) : 331 - 333
  • [43] CYCLE-WISE PROCESS-ZONE MODEL FOR PREDICTION OF DELAYED HYDRIDE CRACKING INITIATION UNDER FLAW-TIP HYDRIDE RATCHETING CONDITIONS
    Xu, Steven X.
    Cui, Jun
    Scarth, Douglas A.
    Cho, David
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2018, VOL 1A, 2019,
  • [44] A normalization method for relationship between yield stress and delayed hydride cracking velocity in Zr-2.5Nb alloys
    Oh, JK
    Kim, IS
    Kim, YS
    [J]. JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2000, 37 (07) : 595 - 600
  • [45] Threshold stress intensity factor, KIH for delayed hydride cracking of a Zr-2.5Nb tube with loading mode
    Kim, Young Suk
    Park, Sun Sam
    Kwun, Sook In
    [J]. JOURNAL OF ALLOYS AND COMPOUNDS, 2008, 462 (1-2) : 367 - 375
  • [46] DELAYED HYDRIDE CRACKING INITIATION EVALUATION OF INTERACTING FLAWS IN A CANDU REACTOR ZR-NB PRESSURE TUBE
    Scarth, Douglas
    Doddihal, Preeti
    Ip, Monique
    [J]. PROCEEDINGS OF ASME 2021 PRESSURE VESSELS AND PIPING CONFERENCE (PVP2021), VOL 4, 2021,
  • [47] EFFECT OF HYDROGEN CONCENTRATION ON THE THRESHOLD STRESS INTENSITY FACTOR FOR DELAYED HYDRIDE CRACKING IN ZR-2.5 NB PRESSURE TUBES
    Shek, Gordon K.
    Metzger, Don R.
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, PVP 2011, VOL 6, A AND B, 2012, : 1287 - 1295
  • [48] The delayed hydride cracking avoidance manoeuvre for Zr-2.5 Nb pressure tube alloy
    Yan, D
    Sun, S
    Eadie, RL
    Shek, GK
    Seahra, H
    [J]. INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2000, 77 (09) : 531 - 538
  • [49] Measurement of Rates of Delayed Hydride Cracking (DHC) in Zr-2.5Nb Alloys-An IAEA Coordinated Research Project
    Coleman, Christopher E.
    Inozemtsev, Victor V.
    [J]. ZIRCONIUM IN THE NUCLEAR INDUSTRY: 15TH INTERNATIONAL SYMPOSIUM, 2009, 1505 : 244 - +
  • [50] DEVELOPMENT OF EVALUATION PROCEDURES FOR CRACK INITIATION FROM IN-SERVICE FLAWS IN CANDU ZR-2.5NB PRESSURE TUBES WITH HYDROGEN
    Cho, David
    Xu, Steven X.
    Scarth, Douglas A.
    Shek, Gordon K.
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2016, VOL 1A, 2017,