AN EXTENDED PROCESS-ZONE MODELING FRAMEWORK FOR OVERLOAD CRACK INITIATION IN ZR-2.5NB PRESSURE TUBES

被引:0
|
作者
Xu, Steven X. [1 ]
Scarth, Douglas A. [1 ]
Cho, David [2 ]
机构
[1] Kinectrics Inc, Toronto, ON M8Z 5G5, Canada
[2] Bruce Power, 123 Front St W, Toronto, ON M5J 2M2, Canada
关键词
Zr-2.5Nb pressure tube; overload crack initiation; flaw-tip hydrides; process-zone; Weibull stress; WEIBULL STRESS PARAMETERS; CALIBRATION; FRACTURE;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Flaws found during in-service inspection of Zr-2.5Nb pressure tubes include fuel bundle scratches, debris fretting flaws, fuel bundle bearing pad fretting flaws and crevice corrosion flaws. These flaws are volumetric and blunt in nature. Crack initiation from these in-service flaws can be caused by the presence of hydrogen in operating pressure tubes and resultant formation of hydrided regions at the flaw tips during reactor heat-up and cool-down cycles. There are two known hydride induced crack initiation mechanisms. One is delayed hydride cracking (DHC) that refers to the situations in which hydride formation and fracture occur at the same applied loads. The second crack initiation mechanism is known as overload crack initiation in a hydrided region. In this case, crack initiation occurs in the course of reactor transients when the applied stress acting on hydrided regions at flaw tips exceeds the stress at which these hydrided regions have been formed. The process-zone model was previously established to predict DHC initiation. There has been recent work to extend the process-zone model for predicting overload crack initiation in hydrided regions ahead of flaw tips. Efforts were made to identify appropriate modeling approaches for the two sequential and distinct physical stages of overload crack initiation: formation of hydrided regions with thermal cycles under constant load, and crack initiation from the pre-existing, fixed hydrided regions ahead of flaw tips under rising load (i.e. overload). The established process-zone methodology is used to model formation of hydrided regions at flaw tips with thermal cycles under constant load. A Weibull stress approach is proposed to predict fracture of the preexisting, flaw-tip hydrided regions during overload. This paper describes the extended process-zone modeling framework for overload crack initiation.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] VALIDATION OF WEIGHT FUNCTION BASED PROCESS-ZONE MODEL FOR EVALUATION OF DELAYED HYDRIDE CRACKING INITIATION IN ZR-2.5NB PRESSURE TUBES
    Xu, Steven X.
    Kawa, Dennis
    Cui, Jun
    Chaput, Heather
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2016, VOL 1A, 2017,
  • [2] EFFECT OF FLAW ORIENTATION ON DELAYED HYDRIDE CRACK INITIATION IN ZR-2.5NB PRESSURE TUBES
    Shek, Gordon K.
    Cui, Jun
    Scarth, Douglas A.
    Xu, Steven
    [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2013, VOL 6A: MATERIALS AND FABRICATION, 2014,
  • [3] Overload fracture of flaw tip hydrides in Zr-2.5Nb pressure tubes
    Shek, Gordon K.
    Cui, Jun
    Perovic, Vuko
    [J]. Zirconium in the Nuclear Industry: 14th International Symposium, 2005, 1467 : 729 - 758
  • [4] Corrosion Fatigue Crack Initiation in Zr-2.5Nb
    Nordin, H. M.
    Phillion, A. J.
    Karlsen, T. M.
    Persaud, S.
    [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL DEGRADATION OF MATERIALS IN NUCLEAR POWER SYSTEMS - WATER REACTORS, VOL 2, 2018, : 525 - 541
  • [5] CRACK INITIATION CRITERION AT NOTCHES IN ZR-2.5NB ALLOYS
    SAGAT, S
    SHI, SQ
    PULS, MP
    [J]. MATERIALS SCIENCE AND ENGINEERING A-STRUCTURAL MATERIALS PROPERTIES MICROSTRUCTURE AND PROCESSING, 1994, 176 (1-2): : 237 - 247
  • [6] Effect of unloading on crack growth rate of Zr-2.5Nb tubes
    Kim, Young Suk
    Makarevicius, Vidas
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2010, 405 (01) : 28 - 32
  • [7] Initiation and Arrest of Delayed Hydride Cracking in Zr-2.5Nb Tubes
    Kim, Young S.
    [J]. JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2009, 131 (01):
  • [8] The transformation behaviour of the β-phase in Zr-2.5Nb pressure tubes
    Griffiths, M.
    Winegar, J. E.
    Buyers, A.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2008, 383 (1-2) : 28 - 33
  • [9] Manufacturing variability and deformation for Zr-2.5Nb pressure tubes
    Bickel, G. A.
    Griffiths, M.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2008, 383 (1-2) : 9 - 13
  • [10] GETTERING OF HYDROGEN FROM ZR-2.5NB PRESSURE TUBES
    CANN, CD
    SEXTON, EE
    BAHURMUZ, AA
    WHITE, AJ
    BALNESS, HR
    LEDOUX, GA
    [J]. JOURNAL OF THE LESS-COMMON METALS, 1991, 172 : 1297 - 1305