共 50 条
- [1] VALIDATION OF WEIGHT FUNCTION BASED PROCESS-ZONE MODEL FOR EVALUATION OF DELAYED HYDRIDE CRACKING INITIATION IN ZR-2.5NB PRESSURE TUBES [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, 2016, VOL 1A, 2017,
- [2] EFFECT OF FLAW ORIENTATION ON DELAYED HYDRIDE CRACK INITIATION IN ZR-2.5NB PRESSURE TUBES [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2013, VOL 6A: MATERIALS AND FABRICATION, 2014,
- [3] Overload fracture of flaw tip hydrides in Zr-2.5Nb pressure tubes [J]. Zirconium in the Nuclear Industry: 14th International Symposium, 2005, 1467 : 729 - 758
- [4] Corrosion Fatigue Crack Initiation in Zr-2.5Nb [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL DEGRADATION OF MATERIALS IN NUCLEAR POWER SYSTEMS - WATER REACTORS, VOL 2, 2018, : 525 - 541
- [5] CRACK INITIATION CRITERION AT NOTCHES IN ZR-2.5NB ALLOYS [J]. MATERIALS SCIENCE AND ENGINEERING A-STRUCTURAL MATERIALS PROPERTIES MICROSTRUCTURE AND PROCESSING, 1994, 176 (1-2): : 237 - 247
- [7] Initiation and Arrest of Delayed Hydride Cracking in Zr-2.5Nb Tubes [J]. JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2009, 131 (01):
- [10] GETTERING OF HYDROGEN FROM ZR-2.5NB PRESSURE TUBES [J]. JOURNAL OF THE LESS-COMMON METALS, 1991, 172 : 1297 - 1305