共 50 条
- [41] An Integrated Two-Stage Inventory and Workforce Planning Model with Variable Production Rates IEEE ACCESS, 2022, 10 : 7127 - 7144
- [49] A Two-Stage Cournot Duopoly with Inventory Costs The Japanese Economic Review, 1997, 48 : 81 - 89
- [50] Analysis of two commodity markovian inventory system with lead time Korean Journal of Computational and Applied Mathematics, 2001, 8 (2): : 427 - 438