Risk assessment for dam failure using probability approach

被引:0
|
作者
Khan, A [1 ]
Jamal, SQ [1 ]
机构
[1] Curtin Univ Technol, Perth, WA 6001, Australia
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Experience has shown that a dam can fail in many different ways and that different consequences of failure are associated with the particular failure modes. These consequences could be natural e.g earthquakes, floods, landslides or human made failure due to under/over judgements in investigation, design, construction, operations, maintenance etc. Thus, calculating and summing the probabilities of failure due to possible modes to determine the total risk as a system is an essential component of risk assessment. This has been achieved using event trees method to calculate the probability of failure of a dam together with assumed values for annual exceedence probabilities of the initiating events like flood and earthquake. The probabilities of failure for various components of New Victoria Dam was analysed using probability distribution and with subject to extreme values of standard deviations and the failure of the components upon which that dam as a system depend for Its reliability. Rational analytical models to analyse reliability using conditional probability of failure of various structures or part of structures, given a particular analysis, are essential to attain the precise estimates for the probability of failure.
引用
收藏
页码:363 / 366
页数:4
相关论文
共 50 条
  • [31] Risk assessment of a dam-break using GIS technology
    Seker, DZ
    Kabdasli, S
    Rudvan, B
    WATER SCIENCE AND TECHNOLOGY, 2003, 48 (10) : 89 - 95
  • [32] ESTIMATION AND VISUALIZATION OF THE PROBABILITY OF FAILING AN ASSESSMENT WHEN USING A FAILURE ASSESSMENT DIAGRAM
    Cochran, Jeffrey D.
    Guo, Ruohua Z.
    Panzarella, Charles H.
    ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2015, VOL 1B, 2015,
  • [33] Rapid risk assessment using probability of fracture nomographs
    Penmetsa, R.
    Tuegel, E.
    Shanmugam, V.
    FATIGUE & FRACTURE OF ENGINEERING MATERIALS & STRUCTURES, 2009, 32 (11) : 886 - 898
  • [34] PROBABILITY MEASURE OF ADEQUACY ASSESSMENT USING A FUZZY APPROACH
    LING, JM
    LIN, CE
    HUANG, CL
    ELECTRIC POWER SYSTEMS RESEARCH, 1995, 33 (01) : 7 - 15
  • [35] Assessment of Water Supply Dam Failure Risk: Development of New Stochastic Failure Modes and Effects Analysis
    Ardeshirtanha, Khalil
    Sharafati, Ahmad
    WATER RESOURCES MANAGEMENT, 2020, 34 (05) : 1827 - 1841
  • [36] Assessment of Water Supply Dam Failure Risk: Development of New Stochastic Failure Modes and Effects Analysis
    Khalil Ardeshirtanha
    Ahmad Sharafati
    Water Resources Management, 2020, 34 : 1827 - 1841
  • [37] Study on Environmental risk of Dam Failure
    Wang, Xiaoling
    Zhou, Zhengyin
    2010 4TH INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING (ICBBE 2010), 2010,
  • [38] Probability of Corrosion Failure Analysis Using An Adaptive Sampling Approach
    Xie, Chaoyang
    Wang, Zequn
    Wang, Pingfeng
    Huang, Hongzhong
    2015 IEEE CONFERENCE ON PROGNOSTICS AND HEALTH MANAGEMENT (PHM), 2015,
  • [39] Prediction Approach for Failure of Tailings Dam
    Miao, Runze
    Zhong, Deyu
    Zhang, Hongwu
    Qin, Jie
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,
  • [40] Probability and Risk of Slope Failure
    Silva, Francisco
    Lambe, T. William
    Marr, W. Allen
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2008, 134 (12) : 1691 - 1699