共 50 条
- [12] Using Bayesian Network to develop a probability assessment approach for construction safety risk Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (SUPPL. 2): : 384 - 391
- [13] A BAYESIAN APPROACH FOR THE ASSESSMENT OF RISK PROBABILITY. CASE STUDY FOR DIGITAL RISK PROBABILITY ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2012, 11 (12): : 2249 - 2256
- [14] The Comprehensive Assessment of Dam Risk Consequences Caused by The Dam Failure Based on The Set Pair Analysis PROCEEDINGS OF THE 2016 6TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS, ENVIRONMENT, BIOTECHNOLOGY AND COMPUTER (MMEBC), 2016, 88 : 801 - 806
- [15] Earthquake Risk Assessment of Bridge Based on Failure Probability Method Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2018, 53 (04): : 696 - 703
- [16] Research on Approach of Uncertainty Analysis for Risk Assessment of Dam Overtopping PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL IV, 2010, : 101 - +
- [17] Failure Probability Model of Transmission and Transformation Equipment for Risk Assessment 2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
- [18] Failure probability estimation of pressure tube using failure assessment diagram SAFETY AND STRUCTURAL INTEGRITY 2006, 2007, 120 : 37 - +
- [19] Dam failure risk factor analysis using AHP method 3RD INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING, 2021, 646