共 50 条
- [34] Application of Earned Value Method to Progress Control of Construction projects XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
- [35] The discussion of the application of EVA dividing rate method on Construction projects 2011 INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION AND INDUSTRIAL APPLICATION (ICIA2011), VOL I, 2011, : 484 - 487
- [36] Application of a method for the environmental impact assessment of university construction projects TECNOLOGIA EN MARCHA, 2016, 29 (03): : 132 - 145
- [37] The discussion of the application of EVA dividing rate method on Construction projects 2010 INTERNATIONAL CONFERENCE ON BIO-INSPIRED SYSTEMS AND SIGNAL PROCESSING (ICBSSP 2010), 2010, : 238 - 241
- [39] Towards developing an improved methodology for evaluating performance and achieving success in construction projects SCIENTIFIC RESEARCH AND ESSAYS, 2009, 4 (06): : 549 - 554