Elevator Group Control with Destination Scheduling

被引:0
|
作者
Wei, Junyan [1 ]
Zhao, Guojun [1 ]
机构
[1] Zhejiang Univ Technol, Key Lab Mech Manufacture & Automat, Minist Educ, Hangzhou 310014, Zhejiang, Peoples R China
关键词
group control system; synchronization; group control algorithm; destination scheduling;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Many-storied buildings can be seen everywhere in modern society, so the application of the elevator group control system is increasing quickly. Aiming at some existing disadvantages, a personalized elevator group control system on destination scheduling is proposed. The paper introduces the instruction and the principle of the system, analyses the relation of the modules, builds the communication among them, uses the optimized scheduling algorithm. The DWIN configuration tool_3.41 is used to design the human-machine interface for calling elevator, the DWIN_OS_Builder_V14 is used to write the assembly program for communicating: the touch-screen receives the command frame from the group control module, responds to the command frame with the button information and shows the number of the selected elevator. The Keil uVision4 is used to write the program by C language: it controls the overall operation of the system. The goal of the system is to realize the destination scheduling well. At last, the experiment proves that the system is novel and convenient.
引用
收藏
页码:1650 / 1654
页数:5
相关论文
共 50 条
  • [41] THE LATEST ELEVATOR GROUP-CONTROL SYSTEM
    UJIHARA, H
    AMANO, M
    MITSUBISHI ELECTRIC ADVANCE, 1994, 67 : 10 - 12
  • [42] Optimal elevator group control by evolution strategies
    Beielstein, T
    Ewald, CP
    Markon, S
    GENETIC AND EVOLUTIONARY COMPUTATION - GECCO 2003, PT II, PROCEEDINGS, 2003, 2724 : 1963 - 1974
  • [43] Elevator group control by using talented algorithm
    Dagdelen, Ulvi
    Bagis, Aytekin
    Karaboga, Dervis
    ARTIFICIAL INTELLIGENCE AND NEURAL NETWORKS, 2006, 3949 : 203 - 210
  • [44] A New Intelligent Group Elevator Control Approach
    Baygin, Mehmet
    Karakose, Mehmet
    PROCEEDINGS OF 15TH INTERNATIONAL CONFERENCE ON MECHATRONICS - MECHATRONIKA 2012, 2012, : 74 - 79
  • [45] A double-deck elevator group supervisory control system with destination floor guidance system using genetic network programming
    Yu, Lu
    Zhou, Jin
    Mabu, Shingo
    Hirasawa, Kotaro
    Hu, Jinglu
    Markon, Sandor
    IEEJ Transactions on Electronics, Information and Systems, 2007, 127 (07) : 1115 - 1122
  • [46] Assignment formulation for the Elevator Dispatching Problem with destination control and its performance analysis
    Ruokokoski, Mirko
    Sorsa, Janne
    Siikonen, Marja-Liisa
    Ehtamo, Harri
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (02) : 397 - 406
  • [47] Robust optimization model of elevator group scheduling based on genetic algorithm
    School of Electrical Engineering and Automation, Tianjin University, Tianjin 300072, China
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban), 2007, 9 (1019-1024):
  • [48] Group Elevator Scheduling during High-rise Building Evacuation
    Ding Ning
    Chen Tao
    Luh, Peter B.
    Zhang Hui
    PROCEEDINGS OF ISCRAM ASIA 2012 CONFERENCE ON INFORMATION SYSTEMS FOR CRISIS RESPONSE AND MANAGEMENT, 2012, : 229 - 235
  • [49] Research of Elevator Group Scheduling System Based on Reinforcement Learning Algorithm
    Zheng, Liu
    Guang, Shu
    Hui, Dong
    PROCEEDINGS OF 2013 2ND INTERNATIONAL CONFERENCE ON MEASUREMENT, INFORMATION AND CONTROL (ICMIC 2013), VOLS 1 & 2, 2013, : 606 - 610
  • [50] Research of elevator group control system based on intelligent control
    Han, Song
    Fengmei, Wang
    2007 International Symposium on Computer Science & Technology, Proceedings, 2007, : 237 - 239