Elevator Group Control with Destination Scheduling

被引:0
|
作者
Wei, Junyan [1 ]
Zhao, Guojun [1 ]
机构
[1] Zhejiang Univ Technol, Key Lab Mech Manufacture & Automat, Minist Educ, Hangzhou 310014, Zhejiang, Peoples R China
关键词
group control system; synchronization; group control algorithm; destination scheduling;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Many-storied buildings can be seen everywhere in modern society, so the application of the elevator group control system is increasing quickly. Aiming at some existing disadvantages, a personalized elevator group control system on destination scheduling is proposed. The paper introduces the instruction and the principle of the system, analyses the relation of the modules, builds the communication among them, uses the optimized scheduling algorithm. The DWIN configuration tool_3.41 is used to design the human-machine interface for calling elevator, the DWIN_OS_Builder_V14 is used to write the assembly program for communicating: the touch-screen receives the command frame from the group control module, responds to the command frame with the button information and shows the number of the selected elevator. The Keil uVision4 is used to write the program by C language: it controls the overall operation of the system. The goal of the system is to realize the destination scheduling well. At last, the experiment proves that the system is novel and convenient.
引用
收藏
页码:1650 / 1654
页数:5
相关论文
共 50 条
  • [21] Elevator group control scheduling based on robust optimization and multi-Agent coordination
    Zong, Qun
    Dou, Li-Qian
    Liu, Wen-Jing
    Wang, Wei-Jia
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2008, 14 (03): : 563 - 567
  • [22] Modeling and scheduling elevator group control system based on MAS and negotiation mechanism of agents
    School of Electronics and Information, Tongji University, Shanghai 200092, China
    不详
    Kongzhi yu Juece Control Decis, 2007, 10 (1184-1188):
  • [23] Elevator group supervisory control system with destination floor guidance system using genetic network programming
    Heo, Hoon
    Mabu, Shingo
    Hirasawa, Kotaro
    Hu, Jinglu
    2006 SICE-ICASE INTERNATIONAL JOINT CONFERENCE, VOLS 1-13, 2006, : 3624 - +
  • [24] A Mixed-integer Programming Approach to Group Control of Elevator Systems with Destination Hall Call Registration
    Wu, Y.
    Tanaka, S.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 26 - 31
  • [25] Dispatching Approach Optimization of Elevator Group Control System with Destination Floor Guidance using Fuzzy Neural Network
    Tai, Jianzhe
    Yang, Suying
    Tan, Hong
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 7085 - 7088
  • [26] PSO-BASED REAL-TIME SCHEDULING FOR ELEVATOR GROUP SUPERVISORY CONTROL SYSTEM
    Li, Zhonghua
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2010, 16 (01): : 111 - 121
  • [27] Optimal parking in group elevator control
    Brand, M
    Nikovski, D
    2004 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1- 5, PROCEEDINGS, 2004, : 1002 - 1008
  • [28] Adaptive elevator group control with cameras
    Kim, JH
    Moon, BR
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2001, 48 (02) : 377 - 382
  • [29] A Mixed Robust Optimization and Multi-agent Coordination Method for Elevator Group Control Scheduling
    Dou, Liqian
    Zong, Qun
    Ji, Yuehui
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1034 - 1038
  • [30] Object-Oriented Modeling of Elevator Control System and Strategies of Elevator Group Control
    Sch. of Comp. Science and Technology, Shanghai Jiao Tong University, Shanghai 200030, China
    Xitong Fangzhen Xuebao, 4 (261+301):