Elevator Group Control with Destination Scheduling

被引:0
|
作者
Wei, Junyan [1 ]
Zhao, Guojun [1 ]
机构
[1] Zhejiang Univ Technol, Key Lab Mech Manufacture & Automat, Minist Educ, Hangzhou 310014, Zhejiang, Peoples R China
关键词
group control system; synchronization; group control algorithm; destination scheduling;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Many-storied buildings can be seen everywhere in modern society, so the application of the elevator group control system is increasing quickly. Aiming at some existing disadvantages, a personalized elevator group control system on destination scheduling is proposed. The paper introduces the instruction and the principle of the system, analyses the relation of the modules, builds the communication among them, uses the optimized scheduling algorithm. The DWIN configuration tool_3.41 is used to design the human-machine interface for calling elevator, the DWIN_OS_Builder_V14 is used to write the assembly program for communicating: the touch-screen receives the command frame from the group control module, responds to the command frame with the button information and shows the number of the selected elevator. The Keil uVision4 is used to write the program by C language: it controls the overall operation of the system. The goal of the system is to realize the destination scheduling well. At last, the experiment proves that the system is novel and convenient.
引用
收藏
页码:1650 / 1654
页数:5
相关论文
共 50 条
  • [1] Modeling and Optimizing of Elevator Group Control System with Destination Floor Guidance
    Tai, Jianzhe
    Yang, Suying
    Shao, Cheng
    7TH INTERNATIONAL CONFERENCE ON SYSTEM SIMULATION AND SCIENTIFIC COMPUTING ASIA SIMULATION CONFERENCE 2008, VOLS 1-3, 2008, : 1370 - 1376
  • [2] Research on Scheduling Algorithm Based on Elevator Group Control System
    Zhang, XueXia
    Fu, An Ying
    Zhang, JinBo
    PROCEEDINGS OF THE 2017 7TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING (ICADME 2017), 2017, 136 : 237 - 243
  • [3] Research on optimal scheduling strategy for elevator group control system
    Li Yan-ping
    Feng Xing-mei
    Chen Liang
    Proceedings of the 2007 Chinese Control and Decision Conference, 2007, : 849 - +
  • [4] Elevator selection with destination control system
    KONE Elevators Ltd., Finland
    不详
    Elevator World, 2006, 1 (148-155):
  • [5] Optimization of elevator group control scheduling with multi-strategy switch
    Tang, Hai-Yan
    Ding, Bao
    Qi, Wei-Gui
    Zhang, Yong-Ming
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 2067 - 2072
  • [6] Hybrid Destination Registration Elevator Group Control System with Artificial Immune Optimization Algorithm
    Xu, Yuge
    Luo, Fei
    Lin, Xiaolan
    2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, : 5067 - 5071
  • [7] Elevator group-control policy with destination registration based on fuzzy neural network
    School of Automation Science and Engineering, South China Univ. of Tech., Guangzhou 510640, China
    Huanan Ligong Daxue Xuebao, 2007, 1 (13-18):
  • [8] Dynamic Partition of Elevator Group Control System with Destination Floor Guidance in Uppeak Traffic
    Yang, Suying
    Tai, Jianzhe
    Shao, Cheng
    JOURNAL OF COMPUTERS, 2009, 4 (01) : 45 - 52
  • [9] NOVEL RS-FNN CONTROL POLICY IN HYBRID ELEVATOR GROUP CONTROL SYSTEM WITH DESTINATION REGISTRATION
    Xu, Yuge
    Luo, Fei
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON WAVELET ANALYSIS AND PATTERN RECOGNITION, VOLS 1 AND 2, 2008, : 23 - 28
  • [10] Multi-objective scheduling algorithm for distributed elevator group control system
    Wang, Zun-Tong
    Sun, Dong
    Qiao, Fei
    Wu, Qi-Di
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2010, 27 (05): : 602 - 608