Fast-track construction for concrete pavement rehabilitation - California urban highway network

被引:0
|
作者
Lee, Eul-Bum
Choi, Kunhee
机构
[1] Univ Calif Berkeley, Pavement Res Ctr, Inst Transportat Studies, Richmond, CA 94804 USA
[2] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This case study presents an innovative fast-track reconstruction approach applied to a heavily trafficked Long-Life (30-plus years) Pavement Rehabilitation Strategies (LLPRS) project on 1-15 in Devore in Southern California. A 4.5-km stretch of badly damaged concrete truck lanes was rebuilt over two 215-h (approximately 9-day) periods with one-roadbed full closures with counterflow traffic and around-the-clock (24 h per day/ 7 days per week) construction operations. The same project would have taken 10 months to complete with traditional nighttime closures. State-of-practice technologies were adopted on this Rapid Rehab project to accelerate construction, mitigate traffic disruptions, and propagate project information. From the initial planning and design stages, engineers used CA4PRS (Construction Analysis for Pavement Rehabilitation Strategies) software incorporated with traffic simulation models to develop an optimal and economical rehabilitation scenario. Post-construction data validated the preconstruction analysis and simulation estimates of productivity and traffic delays. Because of the implementation of an Automated Work Zone Information System and proactive public outreach, a 20% reduction in traffic demand through the construction work zone was achieved and thereby reduced the maximum peak hour delay to a "tolerable" level. Surveys on the project website showed dramatic changes in public perception of the Rapid Rehab extended closures approach from initial reluctance and objection to positive support. Advantages of using this method of fast-track accelerated highway reconstruction included less traffic disruption for the traveling public, longer (more than 30 years) pavement life expectancy, improved safety for motorists and workers, and reduced agency cost compared with the traditional approach using repeated nighttime closures.
引用
下载
收藏
页码:3 / 10
页数:8
相关论文
共 50 条
  • [21] Fast-track rehabilitation after rectal cancer resection
    Schwenk, W.
    Neudecker, J.
    Raue, W.
    Haase, O.
    Mueler, J. M.
    INTERNATIONAL JOURNAL OF COLORECTAL DISEASE, 2006, 21 (06) : 547 - 553
  • [22] “Fast-track” rehabilitation after rectal cancer resection
    W. Schwenk
    J. Neudecker
    W. Raue
    O. Haase
    J. M. Müller
    International Journal of Colorectal Disease, 2006, 21 : 547 - 553
  • [23] Resistance to wear of fast-track Portland cement concrete
    Ghafoori, Nader
    Tays, Matthew W.
    CONSTRUCTION AND BUILDING MATERIALS, 2010, 24 (08) : 1424 - 1431
  • [24] Fast-track rehabilitation in colon surgery.: Contribution of anesthesia
    Moellhoff, T.
    Kress, H.-J.
    Tsompanidis, K.
    Wolf, C.
    Ploum, P.
    ANAESTHESIST, 2007, 56 (07): : 713 - 725
  • [25] GOVERNMENT-INDUSTRY COOPERATION - FAST-TRACK CONCRETE INNOVATION
    NAM, CH
    TATUM, CB
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (03): : 454 - 471
  • [26] FAST-TRACK CONCRETE PAVING TESTED ON PROJECT IN IOWA.
    Anon
    Highway & heavy construction, 1986, 129 (10): : 48 - 51
  • [27] Government-industry cooperation: fast-track concrete innovation
    Nam, C.H.
    Tatum, C.B.
    Journal of Construction Engineering and Management, 1992, 118 (03) : 454 - 471
  • [28] Managing Fast-Track Construction Project in Qatar: Challenges and Opportunities
    Egbelakin, Temitope
    Ogunmakinde, Olabode Emmanuel
    Teshich, Billie
    Omotayo, Temitope
    BUILDINGS, 2021, 11 (12)
  • [29] Perceptions of Construction Risks Due to Fast-Track Activity Overlapping
    Garrido Martins, Claudia
    Bogus, Susan M.
    Valentin, Vanessa
    ENG, 2023, 4 (04): : 2879 - 2895
  • [30] THE DESIGN AND CONSTRUCTION OF A FAST-TRACK CASINO/HOTEL PROJECT IN MACAU
    Lee, David C. S.
    Lee, H. Y.
    Chan, Chester W. M.
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON TALL BUILDINGS, 2010, : 737 - 747