Printed Circuit Board Assembly Modeling for Predictive Reliability Assessment

被引:0
|
作者
Tinca, Iulia-Eliza [1 ]
Ailinei, Iulian-Ionut [2 ]
Davidescu, Arjana [1 ]
机构
[1] Univ Politehn Timisoara, Dept Mechatron, Timisoara, Romania
[2] Univ Politehn Timisoara, Dept Mech & Strength Mat, Timisoara, Romania
关键词
PCB; FEA; copper traces; virtual prototyping;
D O I
10.1109/SIITME56728.2022.9988304
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents the impact of critical factors in printed circuit board assemblies (PCBA) finite element (FE) modeling. Following the authors' previous research on PCB modeling approaches and effective material calibration, this study focuses on the impact of conductive layers in PCB response under static, dynamic, and thermomechanical loading. We evaluate the merit of complex PCB modeling by comparing an equivalent homogenous board model with trace models including copper circuits as shell reinforcements bodies, respectively mapping the traces material properties on the board mesh based on local copper concentration. Lastly, we assess the effect of local CTE mismatch and stiffness over the low cycle fatigue life of the PCBA. The main objective of this work is to propose an efficient methodology for modeling the PCBA for predictive reliability assessment.
引用
收藏
页码:52 / 57
页数:6
相关论文
共 50 条
  • [41] Cost minimization and workload balancing in printed circuit board assembly
    Hillier, MS
    Brandeau, ML
    [J]. IIE TRANSACTIONS, 2001, 33 (07) : 547 - 557
  • [42] Printed circuit board assembly test process and design for testability
    Nguyen, Thao
    Rezvani, Navid
    [J]. ISQED 2008: PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON QUALITY ELECTRONIC DESIGN, 2008, : 594 - 599
  • [43] Workload planning in small lot printed circuit board assembly
    Günther H.-O.
    Grunow M.
    Schorling C.
    [J]. Operations-Research-Spektrum, 1997, 19 (2) : 147 - 157
  • [44] Comparative study of heuristics for optimal printed circuit board assembly
    Nelson, K.M.
    Wille, L.T.
    [J]. Southcon Conference Record, 1995, : 322 - 327
  • [45] Workload planning in small lot printed circuit board assembly
    Gunther, HO
    Grunow, M
    Schorling, C
    [J]. OR SPEKTRUM, 1997, 19 (02) : 147 - 157
  • [46] Setup reduction in printed circuit board assembly by efficient sequencing
    R. Narayanaswami
    V. Iyengar
    [J]. The International Journal of Advanced Manufacturing Technology, 2005, 26 : 276 - 284
  • [47] A note on 'balancing printed circuit board assembly line systems'
    Duman, E
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (18) : 3955 - 3957
  • [48] Scheduling hybrid flowshops in printed circuit board assembly lines
    Jin, ZH
    Ohno, K
    Ito, T
    Elmaghraby, SE
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2002, 11 (02) : 216 - 230
  • [49] An efficient assembly sequencing heuristic for printed circuit board configurations
    Moyer, LK
    Gupta, SM
    [J]. JOURNAL OF ELECTRONICS MANUFACTURING, 1997, 7 (02): : 143 - 160
  • [50] Precedence constrained TSP arising in printed circuit board assembly
    Duman, E
    Or, I
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (01) : 67 - 78