Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction

被引:0
|
作者
Xie, Haiyan [1 ,2 ]
Sumam, Rugma Jayachandrakumar [2 ]
Carey, Nicholas [2 ]
机构
[1] Univ Cambridge, Dept Engn, Cambridge, England
[2] Illinois State Univ, Dept Technol, Normal, IL 61761 USA
关键词
Multivariate Analysis; Prefabrication; Cash Flow; Time-Sensitive Payment; System Dynamics; PERFORMANCE;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A common practice in many production processes of the industrialized and manufactured construction (IMC) is to generate estimates using unit costs. However, customized design, low quantity orders, and packaging prototypes could create unpredictable costs with these processes and jeopardize the profit margins. This research focuses on the IMC project development with the question of how the different payment options could affect the time-cost trade-off formula for the prediction on the cash flow efficiency and liquidity. The proposed system uses multivariate simulations on the information collected from previous jobs with the implementation of second order polynomial trend lines to help predicting future projects. There are many different factors (including transportation distance, inventory capacity, and lifts) that must be considered when utilizing the prefabrication bays for the IMC. These factors affect the time and cost differently under different payment terms. The proposed system implements the system dynamics model to develop a programmable algorithm on the estimated time. The research addresses the following findings: the level of complexity, location of manufacturing plant, and cash flow performance are related to each other. Using observations and refining the margin of error, the results show that this proposed system has the capability of predicting production time based on job specification, which is essential for cost estimating, scheduling, and resource allocation. The proposed system provides an innovative method for the evaluation of cash flow performance in IMC projects.
引用
收藏
页码:281 / 290
页数:10
相关论文
共 50 条
  • [31] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [32] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    [J]. FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [33] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [34] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    [J]. STRUCTURES, 2023, 48 : 798 - 808
  • [35] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    [J]. KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
  • [36] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    [J]. Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [37] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [38] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023,
  • [39] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [40] Performing Time-Cost Trade-Off Analysis via GA-Simulation Mechanism
    Cheng, Tao-Ming
    Chen, Yen-Liang
    [J]. JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2007, 10 (04): : 307 - 316