Linear programming based approaches for the discrete time/cost trade-off problem in project networks

被引:18
|
作者
Hafizoglu, A. B. [2 ]
Azizoglu, M. [1 ]
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Arizona State Univ, Tempe, AZ 85287 USA
关键词
project management; Time/Cost Trade-off; Linear Programming; Branch and Bound;
D O I
10.1057/jors.2009.20
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In project management, the activity durations can often be reduced by dedicating additional resources. The Time/Cost Trade-off Problem considers the compromise between the total cost and the project duration. The discrete version of the problem assumes a number of time/cost pairs, called modes, and selects a mode for each activity. In this paper, we consider the Discrete Time/Cost Trade-off Problem. We study the Deadline Problem, that is, the problem of minimizing total cost subject to a deadline on the project duration. To solve the Deadline Problem, we propose optimization and approximation algorithms that are based on the optimal Linear Programming Relaxation solutions. Our computational results from large-sized problem instances reveal the satisfactory behaviour of our algorithms. Journal of the Operational Research Society (2010) 61, 676-685. doi: 10.1057/jors.2009.20 Published online 25 March 2009
引用
收藏
页码:676 / 685
页数:10
相关论文
共 50 条
  • [31] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [32] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058
  • [33] Solution of discrete time-cost trade-off problem with adaptive search domain
    Bettemir, Onder Halis
    Birgonul, M. Talat
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025, 32 (02) : 1032 - 1052
  • [34] A discrete-time approximation technique for the time-cost trade-off in pert networks
    Azaron, Amir
    Sakawa, Masatoshi
    Tavakkoli-Moghaddam, Reza
    Safaei, Nima
    RAIRO-OPERATIONS RESEARCH, 2007, 41 (01) : 61 - 81
  • [35] Discrete Time-Cost-Environment Trade-Off Problem and Its Application to a Large-Scale Construction Project
    Zheng, Huan
    Zhong, Lin
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 1375 - 1382
  • [36] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
  • [37] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
  • [38] New computational results for the discrete time/cost trade-off problem with time-switch constraints
    Vanhoucke, M
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 359 - 374
  • [39] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [40] A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project
    Zheng, Huan
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2018, : 1709 - 1721