A Study on the Risk Management of unbalanced bid in Subway Construction Tender

被引:0
|
作者
Deng Tie-jun [1 ]
Lu Cheng-gui [1 ]
机构
[1] Hunan Univ, Civil Engn Coll, Changsha, Hunan, Peoples R China
关键词
subway tender; risks of unbalanced bid; significant cost;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The subway construction in China is at the climax period. Given that the owner's risks mainly concentrated in the tender stage after the project establishment, risk control in the tender is directly related to the smooth implementation of subway project and the realization of the objectives. Study on the risk in subway construction tender helps to select the excellent contractors, thus ensuring quality and safety and controlling the investment. The contractor's unbalanced bid in subway construction tender is one of the major risks, which will bring great dangers to investment objective once occurring. In this paper, the "Significant Cost-CS" theory is introduced into the traditional risk management approach, which can simplify the identification process of the risks of unbalanced bid and thereby control the risks effectively.
引用
收藏
页码:181 / 184
页数:4
相关论文
共 50 条
  • [1] Risk Management in the Application of Subway Construction
    Wang Li
    Hu Yalan
    [J]. SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING: THEORY AND PRACTICE, VOL 1, 2012, 114 : 987 - 991
  • [2] Research on Risk Management in Urban Subway Construction
    Ma, Yanting
    Ma, Chunjie
    [J]. RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 3271 - 3274
  • [3] The Study on Gray-hierarchy Analysis in Risk Management of Subway Construction
    Wang, Wentao
    Liu, Zengrong
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMY, MANAGEMENT AND EDUCATION TECHNOLOGY, 2015, 29 : 325 - 330
  • [4] Risk Study on Subway Construction based on Reliability Theory
    Zhao, Ping
    Hao, Fengtian
    [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 1872 - 1877
  • [5] Application of evaluating model of unascertained measure in bid & tender of construction supervision
    Liu, JE
    Wang, HK
    Zhang, LK
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 337 - 340
  • [6] Environmental risk management for a cross interchange subway station construction in China
    Fang, Qian
    Zhang, Dingli
    Wong, Louis Ngai Yuen
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (06) : 750 - 763
  • [7] Study on the Mechanism of Safety Risk Propagation in Subway Construction Projects
    Han, Yuanwen
    Shen, Jiang
    Zhu, Xuwei
    An, Bang
    Liu, Fusheng
    Bao, Xueying
    [J]. SUSTAINABILITY, 2024, 16 (02)
  • [8] Influence of the new tender law on construction project bid prices and durations in Kuwait
    Al-Sabah, Ruqaya
    Abdulrahim, Fatema
    [J]. JOURNAL OF ENGINEERING RESEARCH, 2021, 9 (02): : 27 - 42
  • [9] Risk Management for Beijing Subway Tunnel Construction Using the New Austrian Tunneling Method: A Case Study
    Xu, Wei
    Liu, Bo
    Fu, Chunqing
    Han, Yanhui
    Ren, Xin
    [J]. INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2019: SMARTER AND SAFER MOBILITY AND CITIES, 2019, : 423 - 435
  • [10] The research of subway construction management methods
    Tang, Yongsheng
    [J]. Energy Education Science and Technology Part A: Energy Science and Research, 2014, 32 (06): : 5725 - 5730