Risk Study on Subway Construction based on Reliability Theory

被引:6
|
作者
Zhao, Ping [1 ]
Hao, Fengtian [1 ]
机构
[1] Xian Univ Architecture & Technol, Coll Civil Engn, Xian 710055, Peoples R China
关键词
parallel-series system; reliability allocation; subway risk;
D O I
10.4028/www.scientific.net/AMM.44-47.1872
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper described the present risks existing in subway construction and proposed the idea that reliability theory can be applied in the field of subway construction. Based on this, a parallel-series model of risk control system was established. According to the required target of system reliability, combining with the reliability distribution theory, the reliabilities of each subsystem that constituted the parallel-series model can be determined. Aiming at the basic events that constituted the subsystem, average allocation method was taken to solve the basic events reliabilities and an example was given. This studies showed that reliability theory can be successfully applied in the field of subway construction and can fulfill the optimization of construction safety under a given security target.
引用
收藏
页码:1872 / 1877
页数:6
相关论文
共 50 条
  • [1] The reliability theory based expert system research for Subway construction safety risk identification
    Wu, Xianguo
    Liu, Huitao
    Zhang, Limao
    Ding, Baojun
    Zhai, Haizhou
    Li, Xi
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1739 - 1748
  • [2] Risk Study on Underground Construction Using Reliability Theory
    Li Meng
    Wang Jialin
    [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 2959 - 2962
  • [3] Study on theory of reliability analysis in construction risk management
    Deng, TJ
    Qiu, YK
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 2415 - 2421
  • [4] Optimization Study of Subway Station Underground Excavation Construction Method Based on Fuzzy Theory
    Geng, Dongyang
    Yu, Xiangmei
    Cao, Lijun
    [J]. CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1015 - 1019
  • [5] Construction Risk of Foundation Pit of Subway Station Based on Rough Set Theory and Catastrophe Progression Method
    He Jian
    Pan HaiZe
    Chen MengJie
    Miao Wei
    [J]. ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (04): : 1615 - 1628
  • [6] Study on the Mechanism of Safety Risk Propagation in Subway Construction Projects
    Han, Yuanwen
    Shen, Jiang
    Zhu, Xuwei
    An, Bang
    Liu, Fusheng
    Bao, Xueying
    [J]. SUSTAINABILITY, 2024, 16 (02)
  • [7] Research on Risk Control of Logistics Park Construction Project Based on Reliability Theory
    Wang, Yuzhou
    [J]. INTELLIGENT AND INTEGRATED SUSTAINABLE MULTIMODAL TRANSPORTATION SYSTEMS PROCEEDINGS FROM THE 13TH COTA INTERNATIONAL CONFERENCE OF TRANSPORTATION PROFESSIONALS (CICTP2013), 2013, 96 : 2194 - 2200
  • [8] Construction Risk Analysis of Subway Station Based on Bayesian Network
    Hou, Shiwei
    Zhang, Xin
    Xin, Zhiguo
    Zhang, Xueli
    [J]. PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 361 - 366
  • [9] A Study on the Risk Management of unbalanced bid in Subway Construction Tender
    Deng Tie-jun
    Lu Cheng-gui
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 181 - 184
  • [10] Quantitative Risk Assessment Method Based on Risk Theory of Subway Station
    Dai, Bao-qian
    Zhang, Jin
    Zhou, Yang-fan
    Wang, Tong
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON COMPUTER NETWORKS AND COMMUNICATION TECHNOLOGY (CNCT 2016), 2016, 54 : 678 - 682