共 50 条
- [32] Construction risk analysis of urban subway in broken rock strata [J]. Electronic Journal of Geotechnical Engineering, 2014, 19 Q : 4189 - 4206
- [33] Risk Analysis and Control Factors Based on Excavation of a Large Underground Subway Station under Construction [J]. SYMMETRY-BASEL, 2020, 12 (10): : 1 - 18
- [34] Fuzzy Comprehensive Evaluation of Waterproof Construction Risk of Subway Station Based on Analytic Network Process [J]. 2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 452 - 457
- [35] Identification and Gradation of Risk Sources in Subway Station Construction Based on Hole-pile Method [J]. CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1020 - 1023
- [36] Safety and reliability assessment using fuzzy theory applied to a subway system [J]. COMPUTERS IN RAILWAYS VIII, 2002, 13 : 661 - 670
- [37] Environmental Risk Source Analysis and Classification of Zones: Subway Construction [J]. APPLIED SCIENCES-BASEL, 2023, 13 (10):
- [38] Risk assessment on subway tunnel engineering during construction process [J]. Jiefangjun Ligong Daxue Xuebao/Journal of PLA University of Science and Technology (Natural Science Edition), 2009, 10 (04): : 379 - 383
- [39] Construction risk analysis of urban subway in broken rock strata [J]. 1600, E-Journal of Geotechnical Engineering (19):
- [40] Construction Schedule Risk Analysis Based on Complex System Theory: Methodology and Empirical Study [J]. PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 959 - 968