Risk Study on Subway Construction based on Reliability Theory

被引:6
|
作者
Zhao, Ping [1 ]
Hao, Fengtian [1 ]
机构
[1] Xian Univ Architecture & Technol, Coll Civil Engn, Xian 710055, Peoples R China
关键词
parallel-series system; reliability allocation; subway risk;
D O I
10.4028/www.scientific.net/AMM.44-47.1872
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper described the present risks existing in subway construction and proposed the idea that reliability theory can be applied in the field of subway construction. Based on this, a parallel-series model of risk control system was established. According to the required target of system reliability, combining with the reliability distribution theory, the reliabilities of each subsystem that constituted the parallel-series model can be determined. Aiming at the basic events that constituted the subsystem, average allocation method was taken to solve the basic events reliabilities and an example was given. This studies showed that reliability theory can be successfully applied in the field of subway construction and can fulfill the optimization of construction safety under a given security target.
引用
收藏
页码:1872 / 1877
页数:6
相关论文
共 50 条
  • [31] Research on Safety Risk Transfer in Subway Shield Construction Based on Text Mining and Complex Networks
    Wu, Kunpeng
    Zhang, Jianshe
    Huang, Yanlong
    Wang, Hui
    Li, Hujun
    Chen, Huihua
    [J]. BUILDINGS, 2023, 13 (11)
  • [32] Construction risk analysis of urban subway in broken rock strata
    Dai, Chun-Quan
    Zhao, Zeng-Hui
    [J]. Electronic Journal of Geotechnical Engineering, 2014, 19 Q : 4189 - 4206
  • [33] Risk Analysis and Control Factors Based on Excavation of a Large Underground Subway Station under Construction
    Zhang, Zhien
    Huang, Mingli
    Wu, Baohua
    [J]. SYMMETRY-BASEL, 2020, 12 (10): : 1 - 18
  • [34] Fuzzy Comprehensive Evaluation of Waterproof Construction Risk of Subway Station Based on Analytic Network Process
    Wu, Kunpeng
    Ma, Xiaojian
    Meng, Fanli
    Wang, Xiaorui
    [J]. 2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 452 - 457
  • [35] Identification and Gradation of Risk Sources in Subway Station Construction Based on Hole-pile Method
    Geng, Dongyang
    Cao, Lijun
    Yu, Xiangmei
    [J]. CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1020 - 1023
  • [36] Safety and reliability assessment using fuzzy theory applied to a subway system
    Cugnasca, PS
    [J]. COMPUTERS IN RAILWAYS VIII, 2002, 13 : 661 - 670
  • [37] Environmental Risk Source Analysis and Classification of Zones: Subway Construction
    Yuan, Yangchun
    Qin, Yongjun
    Zhang, Yongkang
    Xie, Liangfu
    Meng, Xin
    Guo, Zheyi
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (10):
  • [38] Risk assessment on subway tunnel engineering during construction process
    Wang, Jing
    Tan, Yue-Hu
    Wang, Peng-Fei
    Jiang, Wei
    [J]. Jiefangjun Ligong Daxue Xuebao/Journal of PLA University of Science and Technology (Natural Science Edition), 2009, 10 (04): : 379 - 383
  • [39] Construction risk analysis of urban subway in broken rock strata
    [J]. 1600, E-Journal of Geotechnical Engineering (19):
  • [40] Construction Schedule Risk Analysis Based on Complex System Theory: Methodology and Empirical Study
    Xu, Xiaoxiao
    Wang, Jiayuan
    Huang, Wenke
    Wu, Huanyu
    Li, Yaning
    [J]. PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 959 - 968