Drivers to the workover rig problem

被引:7
|
作者
Bissoli, Dayan de Castro [1 ]
Diniz Chaves, Gisele de Lorena [2 ]
Ribeiro, Glaydston Mattos [3 ]
机构
[1] Alto Univ, Fed Univ Espirito, S-N, BR-29500000 Alegre, ES, Brazil
[2] Univ Fed Espirito Santo, Rodovia BR 101 Norte,Km 60, BR-29932540 Sao Mateus, ES, Brazil
[3] Univ Fed Rio de Janeiro, Ave Horacio Macedo 2030, BR-21941914 Rio De Janeiro, RJ, Brazil
关键词
Workover rig problem; Vehicle routing problem; Dynamic; Multi-objective; Decline curves; VEHICLE-ROUTING PROBLEM; OIL; INEQUALITIES; PERFORMANCE; ALGORITHM; FLEET;
D O I
10.1016/j.petrol.2015.12.009
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
When onshore oil wells reduce the production due to a malfunction, workover rigs are used to restore productivity. Given a set of wells needing maintenance and a set of workover rigs, the workover rig problem (WRP) consists of finding rig routes for minimizing the total production loss of the wells within a finite time horizon. The wells have different loss rates and require different services such as cleaning, reinstatement and stimulation. The rigs can be at different positions in the oil field and can have different equipment. This problem shares some of the same characteristics of the vehicle routing problems. Using a literature review, we offer some new ways to consider and approach the problem in its actual context. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:13 / 22
页数:10
相关论文
共 50 条
  • [21] Study on hydraulic energy-recovering workover rig and the simulation for lifting the pipestring
    Zhang Lujun
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2007, 129 (02): : 96 - 101
  • [22] Development and Application for the Hydraulic System of Skid-mounted Live Well Workover Rig
    Wang Jie
    Dai Lin
    Li Zhi
    Wang Yemu
    CONFERENCE PROCEEDINGS OF 2018 4TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND ROBOTICS (ICCAR), 2018, : 504 - 508
  • [23] Simulation and study of power-recovering hydraulic workover rig lowering oil pipestring
    Zhang, Lu-Jun
    Xitong Fangzhen Xuebao / Journal of System Simulation, 2007, 19 (11): : 2599 - 2602
  • [24] MOBILE DRILLING- AND WORKOVER RIG IDECO-SBS DIR-800.
    Navratil, R.
    Schiefer, K.
    Oil Gas European Magazine, 1987, 13 (02): : 26 - 27
  • [25] The finite element analysis of derrick translation system in vehicular pressure balance workover rig
    Yan, Mingyin
    Li, Chengyang
    Jin, Jiaqi
    FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE IV, PTS 1-5, 2014, 496-500 : 836 - +
  • [26] Workover Rig Control System Based on AC/DC Hybrid Micro-Grid
    Xu, Gang
    Liang, Zhi-Shan
    Wang, Xu
    Luo, Yun-Long
    INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING AND AUTOMATION CONTROL (ICEEAC 2017), 2017, 123 : 165 - 171
  • [27] Optimizing Workover Rig Fleet Sizing and Scheduling Using Deterministic and Stochastic Programming Models
    Fernandez Perez, Miguel A.
    Oliveira, Fabricio
    Hamacher, Silvio
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2018, 57 (22) : 7544 - 7554
  • [28] Well control problem leads to better workover procedures
    Bailey, Jack M.
    1600, PennWell Publ Co, Tulsa, OK, United States (93):
  • [29] Inverse Dynamics Simulation and Quantitative Evaluation of Comfort Level for Brake Operations on Workover Rig
    Xu Jianbo
    Yu Suihuai
    Fan Wen
    2016 INTERNATIONAL CONFERENCE ON ROBOTS & INTELLIGENT SYSTEM (ICRIS), 2016, : 224 - 227
  • [30] WELL CONTROL PROBLEM LEADS TO BETTER WORKOVER PROCEDURES
    BAILEY, JM
    OIL & GAS JOURNAL, 1995, 93 (03) : 51 - 53