Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem

被引:43
|
作者
Dang Cong Hop [1 ]
Nguyen Van Hop [1 ]
Truong Tran Mai Anh [1 ]
机构
[1] Int Univ, VNU HCMC, Sch Ind Engn & Management, Quarter 6, Ho Chi Minh City, Vietnam
关键词
Quay crane; Yard truck; Scheduling; Particle Swarm Optimization (PSO); DISPATCHING METHOD; ALGORITHM; ASSIGNMENT; VEHICLES; BRANCH; BERTH;
D O I
10.1016/j.cie.2020.107075
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This study takes into account the integrated quay crane and yard truck scheduling problem in which the yard truck picks containers at quay crane and then transports required containers to the container yard then return to the quay crane without carrying exported containers. A new mixed - integer programming model is formulated to capture two more conditions on the number of containers to be handled by quay crane and yard truck at a time. The objective is to minimize total time to complete the unloading and transporting operations for all required containers. Moreover, an Adaptive Particle Swarm Optimization (APSO) algorithm with all automatically adjusted parameters of inertia weight, cognitive coefficient and social coefficient is developed to search for better solutions. The proposed APSO gives closed optimal solutions obtained from the mixed - integer program. It also gives better performance than similar metaheuristic approaches such as Fixed Particle Swarm Optimization (FPSO) and Grey Wolf Optimization (GWO) for large sized problems in reasonable time.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Optimization of yard crane scheduling, using particle swarm optimization with genetic algorithm operators (PSOGAO)
    Kumar, M. Manoj
    Omkar, S. N.
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2008, 67 (05): : 335 - 339
  • [22] Bacterial Colony Optimization for Integrated Yard Truck Scheduling and Storage Allocation Problem
    Niu, Ben
    Xie, Ting
    Bi, Ying
    Liu, Jing
    INTELLIGENT COMPUTING IN BIOINFORMATICS, 2014, 8590 : 431 - 437
  • [23] The Quay Crane Scheduling Problem
    Al-Dhaheri, Noura
    Diabat, Ali
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 87 - 94
  • [24] An improved particle swarm optimization algorithm for berth allocation and time-variant quay crane scheduling problem during an emergency
    Ran, Lingyu
    Liu, Boning
    Zhang, Guiqing
    Cheng, Yongxi
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 269
  • [25] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
  • [26] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem
    Yang, Kong-hung
    INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
  • [27] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [28] The Allocation of Berth and Quay Crane by Using a Particle Swarm Optimization Technique
    Yang, Chutian
    Wang, Su
    Zheng, Jun
    PROCEEDINGS OF 2013 CHINESE INTELLIGENT AUTOMATION CONFERENCE: INTELLIGENT AUTOMATION, 2013, 254 : 779 - 787
  • [29] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Wang, Yan
    Kim, Kap Hwan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 459 - 470
  • [30] Modeling of integrated quay cranes, yard trucks and yard cranes scheduling problem for outbound containers
    Xiao, Yujie
    Zheng, Yan
    Li, Peng
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND ENGINEERING APPLICATIONS, 2016, 63 : 38 - 43