Hierarchical production planning and scheduling in a multi-product, multi-machine environment

被引:30
|
作者
Qiu, MM
Burch, EE
机构
[1] School of Business and Economics, Longwood College, Farmville, VA
[2] Clemson University, Clemson, SC
关键词
D O I
10.1080/002075497194273
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A hierarchical production planning (HPP) and scheduling model is developed to solve a real-world problem in fibre manufacturing scheduling. The problem under study requires determining production sequences in the presence of variable setup costs in a multi-machine and multi-product environment. The concept of expected setup cost is developed to reduce the difficulty of addressing sequence-dependent setup costs at the aggregate level. A mixed integer linear programming model (MILP) incorporates the logic of expert systems to minimize the number and costs of machine setups and other associated costs. At the daily operational level, a set of heuristics is developed to manage contingencies, such as machine breakdowns and changes in demand. The heuristics effectively utilize idle capacity and inventories to smooth production and avoid unnecessary extra setups, therefore maintaining system stability. Data provided by the fibre plant is used to validate the model. Compared to the actual schedule, results from the model are more consistent with managerial priorities and substantial cost savings are obtained.
引用
收藏
页码:3023 / 3042
页数:20
相关论文
共 50 条
  • [41] Multi-machine Scheduling with Setup Times
    Bozejko, Wojciech
    Kacprzak, Lukasz
    Nadybski, Piotr
    Wodecki, Mieczyslaw
    COMPUTER INFORMATION SYSTEMS AND INDUSTRIAL MANAGEMENT, CISIM 2016, 2016, 9842 : 300 - 311
  • [42] The multi-product pipeline scheduling system
    MirHassani, S. A.
    Ghorbanalizadeh, M.
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2008, 56 (04) : 891 - 897
  • [43] MULTI-PRODUCT SCHEDULING IN A CHEMICAL PLANT
    EILON, S
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1969, 15 (06): : B267 - B279
  • [44] Scheduling a multi-product pipeline network
    de Souza Filho, Erito Marques
    Bahiense, Laura
    Martins Ferreira Filho, Virgilio Jose
    COMPUTERS & CHEMICAL ENGINEERING, 2013, 53 : 55 - 69
  • [45] Multi-machine scheduling with linear deterioration
    Mosheiov, G
    INFOR, 1998, 36 (04) : 205 - 214
  • [46] Multi-machine scheduling with variance minimization
    Cai, XQ
    Cheng, TCE
    DISCRETE APPLIED MATHEMATICS, 1998, 84 (1-3) : 55 - 70
  • [47] Genetic algorithms for scheduling optimization on a multi-product batch processing machine
    He, L
    Mort, N
    INTELLIGENT MANUFACTURING SYSTEMS 1997 (IMS'97), 1997, : 115 - 120
  • [48] A hybrid heuristic and linear programming approach to multi-product machine scheduling
    Goncalves, JF
    Leachman, RC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 110 (03) : 548 - 563
  • [49] Sustainable Multi-Product Seafood Production Planning Under Uncertainty
    Simanjuntak, Ruth
    Sembiring, Monalisa
    Sinaga, Rani
    Pakpahan, Endang J.
    Mawengkang, Herman
    INTERNATIONAL CONFERENCE ON ADVANCEMENT IN SCIENCE AND TECHNOLOGY 2012 (ICAST): CONTEMPORARY MATHEMATICS, MATHEMATICAL PHYSICS AND THEIR APPLICATIONS, 2013, 435
  • [50] Joint production and subcontracting planning of unreliable multi-facility multi-product production systems
    Assid, M.
    Gharbi, A.
    Dhouib, K.
    Omega (United Kingdom), 2015, 50 : 54 - 69