Scheduling a multi-product pipeline network

被引:13
|
作者
de Souza Filho, Erito Marques [1 ]
Bahiense, Laura [2 ]
Martins Ferreira Filho, Virgilio Jose [3 ]
机构
[1] Rural Fed Univ Rio de Janeiro DTL UFRRJ, Fed Univ Rio de Janeiro COPPE UFRJ, Rio De Janeiro, Brazil
[2] Fed Univ Rio de Janeiro COPPE UFRJ, Rio De Janeiro, Brazil
[3] Fed Univ Rio de Janeiro EP & COPPE UFRJ, Rio De Janeiro, Brazil
关键词
Pipeline networks; Scheduling; Multi-product network; Oil products; FRAMEWORK; PRODUCTS; SYSTEMS;
D O I
10.1016/j.compchemeng.2013.01.019
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Daily some millions barrels of oil are moved around the world in imports and exports and domestically within countries. While ships are the main mode for intercontinental transport, pipelines are the chief form of transcontinental transport, while regional and local transports is performed by trains and trucks. Despite high installation costs, pipelines are considered highly efficient as a mode for transporting large amounts of oil and oil products over long distances, because they offer lower operation costs, higher reliability rates, lower product loss rates, less environmental impact, and less susceptibility to adverse weather conditions than other modes. This study deals with a multi-product pipeline system that transports a set of oil products (diesel, gasoline and kerosene, for example), which have to be moved from points (operating areas) where they are produced or stored (refineries, terminals) to points where they are needed (other refineries, distribution centers, terminals, ports, customers) through a pipeline or set of pipelines. The present study contributes primarily by offering an efficient tool for the problem of scheduling multi-product pipeline networks. The methodology proposed takes the approach of discretizing both pipelines and planning horizon and combines an efficient MILP model with a post-processing heuristic. When compared with previous models, we propose a more efficient one in which the set of volumetric constraints is modeled in the form of knapsack cascading constraints and constraints on products in pipeline sections, which made for significantly improved performance in the experiments that were conducted. The proposed methodology thus constitutes an advance in terms of modeling the problem, making it feasible to solve problems increasingly close to the realities confronting oil industry operators. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:55 / 69
页数:15
相关论文
共 50 条
  • [1] The multi-product pipeline scheduling system
    MirHassani, S. A.
    Ghorbanalizadeh, M.
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2008, 56 (04) : 891 - 897
  • [2] Integrated Scheduling for A Multi-Product Pipeline Network with Delivery Due Dates
    Xu, Ning
    Liao, Qi
    Liang, Yongtu
    Li, Zhengbing
    Zhang, Haoran
    [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 3, 2018,
  • [3] A hybrid heuristic for the multi-product straight pipeline scheduling problem
    Bamoumen, M.
    Belil, S.
    Elfirdoussi, S.
    Ren, L.
    Tchernev, N.
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 535 - 540
  • [4] Efficient multi-product multi-BOM batch scheduling for a petrochemical blending plant with a shared pipeline network
    Hill, Alessandro
    Cornelissens, Trijntje
    Sorensen, Kenneth
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2016, 84 : 493 - 506
  • [5] A self-learning approach for optimal detailed scheduling of multi-product pipeline
    Zhang, Haoran
    Liang, Yongtu
    Liao, Qi
    Shen, Yun
    Yan, Xiaohan
    [J]. JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2018, 327 : 41 - 63
  • [6] An MILP approach for detailed scheduling of oil depots along a multi-product pipeline
    Hao-Ran Zhang
    Yong-Tu Liang
    Qi Liao
    Jing Ma
    Xiao-Han Yan
    [J]. Petroleum Science, 2017, (02) : 434 - 458
  • [7] An MILP approach for detailed scheduling of oil depots along a multi-product pipeline
    Hao-Ran Zhang
    Yong-Tu Liang
    Qi Liao
    Jing Ma
    Xiao-Han Yan
    [J]. Petroleum Science., 2017, 14 (02) - 458
  • [8] An MILP approach for detailed scheduling of oil depots along a multi-product pipeline
    Zhang, Hao-Ran
    Liang, Yong-Tu
    Liao, Qi
    Ma, Jing
    Yan, Xiao-Han
    [J]. PETROLEUM SCIENCE, 2017, 14 (02) : 434 - 458
  • [9] An MILP approach for detailed scheduling of multi-product pipeline in pressure control mode
    Liao, Qi
    Liang, Yongtu
    Xu, Ning
    Zhang, Haoran
    Wang, Junao
    Zhou, Xingyuan
    [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2018, 136 : 620 - 637
  • [10] MULTI-FACILITY, MULTI-PRODUCT SCHEDULING
    不详
    [J]. JOURNAL OF SYSTEMS MANAGEMENT, 1975, 26 (07): : 42 - 43