Quantity-based approach to preliminary cost estimates for highway projects

被引:24
|
作者
Chou, Jui-Sheng
Peng, Min
Persad, Khali R.
O'Connor, James T.
机构
[1] Natl Chung Cheng Univ, Dept Business Adm, Chiayi 621, Taiwan
[2] Univ Texas, Dept Civil Architectural & Environm Engn, Austin, TX 78712 USA
[3] Univ Texas, Ctr Transportat Res, Austin, TX 78712 USA
来源
CONSTRUCTION 2006 | 2006年 / 1946期
关键词
D O I
10.3141/1946-03
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The preliminary cost estimate heavily influences the fate of a transportation project, yet it can be up to an order of magnitude off the final bid amount. Poor prediction of costs in state departments of transportation can lead to less-than-optimal project selection at the front end and delays later when funding is not adequate to cover planned projects. A demonstration is made of the potential to separate quantity uncertainty from price uncertainty. If item quantities can be predicted early, then readily available unit prices can be applied to create a semidetailed preliminary estimate. Compared with the typical practice of applying a gross cost per lane mile, the proposed approach provides a more detailed basis for tracking the effects of changes during project development. This methodology is being tested for implementation by the Texas Department of Transportation.
引用
下载
收藏
页码:22 / 30
页数:9
相关论文
共 50 条
  • [21] Information quantity-based decision rule acquisition from decision tables
    Sun, Lin
    Xu, Jiucheng
    Song, Yanpei
    Journal of Convergence Information Technology, 2012, 7 (02) : 57 - 67
  • [22] Using bi-level programming to analyze the royalty for private-public partnership projects: the operational quantity-based model
    Kang, Chao-Chung
    Feng, Cheng-Min
    Kuo, Chiu-Yen
    TRANSPORTATION PLANNING AND TECHNOLOGY, 2010, 33 (03) : 315 - 328
  • [23] Impact of packaging on the cost of highway construction projects
    Zhang, Zhihui
    He, Qianru
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2010, 50 (06): : 830 - 833
  • [24] Contributing Cost Variation Factors in Highway Projects
    Sohu, Samiullah
    Abdullah, Abd Halid
    Nagapan, Sasitharan
    Jhatial, Ashfaque Ahmed
    Tahir, Muhammed
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (08): : 1793 - 1798
  • [25] A brief on cost controls of highway construction projects
    Liu, Y.
    Gong, G.
    Zhan, X.
    SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 17 - 17
  • [26] Cost structure of the highway projects in the Czech Republic
    Heralova, Renata Schneiderova
    Hromada, Eduard
    Johnston, Hal
    CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 222 - 230
  • [27] Modeling and Indexing the Cost of Highway Projects to a Responsive Highway User Fee
    El Said, Said
    Stammer, Robert
    TRANSPORTATION RESEARCH RECORD, 2023, 2677 (02) : 1126 - 1137
  • [28] Quantity-based reasoning in the broader autism phenotype: A web-based study
    Van Tiel, Bob
    Kissine, Mikhail
    APPLIED PSYCHOLINGUISTICS, 2018, 39 (06) : 1373 - 1403
  • [29] Optimal Pricing and Inventory Control Policy with Quantity-Based Price Differentiation
    Lu, Ye
    Chen, Youhua
    Song, Miao
    Yan, Xiaoming
    OPERATIONS RESEARCH, 2014, 62 (03) : 512 - 523
  • [30] A Quantity-Based Method to Predict More Accurate Project Completion Time
    Chang, Hsien-Kuan
    Yu, Wen-Der
    Cheng, Tao-Ming
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (10) : 2861 - 2875