共 50 条
- [31] Two-machine flow shop no-wait scheduling with machine maintenance [J]. 4OR, 2005, 3 (4) : 303 - 313
- [34] Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility [J]. Journal of Combinatorial Optimization, 2018, 35 : 108 - 125
- [35] A Hybrid Intelligence Algorithm for No-wait Flow Shop Scheduling [J]. ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 2447 - +
- [36] No-wait flow shop scheduling with large lot sizes [J]. Annals of Operations Research, 1997, 70 : 415 - 438
- [37] No-wait flow shop scheduling with large lot sizes [J]. ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 415 - 438
- [38] Variable neighborhood search for no-wait flow shop scheduling [J]. Zhongguo Jixie Gongcheng, 2006, 16 (1741-1743):
- [39] NEW RESULTS ON NO-WAIT FLOW-SHOP SCHEDULING [J]. LECTURE NOTES IN CONTROL AND INFORMATION SCIENCES, 1990, 143 : 436 - 445
- [40] An Island Model for the No-Wait Flow Shop Scheduling Problem [J]. PARALLEL PROBLEM SOLVING FROM NATURE-PPSN XI, PT II, 2010, 6239 : 280 - 289