共 50 条
- [1] A heuristic for no-wait flow shop scheduling [J]. The International Journal of Advanced Manufacturing Technology, 2013, 68 : 1327 - 1338
- [2] A heuristic for no-wait flow shop scheduling [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (5-8): : 1327 - 1338
- [3] Hybrid Discrete EDA for the No-Wait Flow Shop Scheduling Problem [J]. INTELLIGENT COMPUTING, NETWORKED CONTROL, AND THEIR ENGINEERING APPLICATIONS, PT II, 2017, 762 : 105 - 114
- [4] A discrete whale optimization algorithm for the no-wait flow shop scheduling problem [J]. MEASUREMENT & CONTROL, 2023, 56 (9-10): : 1764 - 1779
- [6] A Quantum-PSO Algorithm for No-Wait Flow shop Scheduling Problem [J]. 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 179 - +
- [7] Fitness landscape analysis for the no-wait flow-shop scheduling problem [J]. Journal of Heuristics, 2012, 18 : 25 - 51
- [8] A composite heuristic for the no-wait flow shop scheduling [J]. 2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
- [9] Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization [J]. The International Journal of Advanced Manufacturing Technology, 2013, 66 : 1563 - 1572
- [10] Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12): : 1563 - 1572