共 50 条
- [1] A heuristic for no-wait flow shop scheduling [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (5-8): : 1327 - 1338
- [2] A composite heuristic for the no-wait flow shop scheduling [J]. 2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
- [4] A constructive heuristic for minimizing makespan in no-wait flow shop scheduling [J]. The International Journal of Advanced Manufacturing Technology, 2009, 41 : 97 - 109
- [5] A constructive heuristic for minimizing makespan in no-wait flow shop scheduling [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (1-2): : 97 - 109
- [6] Constructive heuristic algorithm for no-wait flow-shop scheduling with objective of makespan [J]. Proceedings of the 2007 Chinese Control and Decision Conference, 2007, : 901 - 904
- [7] Heuristic Algorithm Based on the Crucial Machine for the No-Wait Flow-Shop Scheduling [J]. CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 5121 - +
- [8] A High Quality Solution Constructive Heuristic for No-Wait Flow Shop Scheduling Problem [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2016, 15 (03): : 206 - 214
- [10] No-wait flow shop scheduling with large lot sizes [J]. ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 415 - 438