No-wait two-stage multiprocessor flow shop scheduling with unit setup

被引:24
|
作者
Huang, Rong-Hwa [2 ]
Yang, Chang-Lin [1 ]
Huang, Yau-Chi [2 ]
机构
[1] Fu Jen Catholic Univ, Dept Business Adm, Hsinchuang, Taipei, Taiwan
[2] Fu Jen Catholic Univ, Grad Inst Management, Hsinchuang, Taipei, Taiwan
关键词
No-wait operations; Multiprocessor flow shop; Ant colony optimization; ANT COLONY OPTIMIZATION; MULTIPLE PROCESSORS; PARALLEL MACHINES; MAKESPAN; ALGORITHM; TIMES;
D O I
10.1007/s00170-008-1865-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A well-arranged production schedule enhances equipment utility rate by distributing limited resources properly, which also improves efficiency and reduces costs. No-wait operations are among the most common production models. A wet batch in semiconductor packaging processes, for instance, is restricted by technical factors such as the chemical dye, which cannot be exposed to air for prolonged periods. Thus, a no-wait process between batches is necessary. This study considers a no-wait two-stage multiprocessor flow shop with setup time that minimizes total completion time. Integer programming model and an ant colony optimization (ACO) heuristic were implemented to test, analyze, and compare simulated data. The ACO results revealed that efficiency was substantially better than that achieved by integer programming, and the heuristic solutions were quite satisfactory.
引用
收藏
页码:921 / 927
页数:7
相关论文
共 50 条
  • [1] No-wait two-stage multiprocessor flow shop scheduling with unit setup
    Huang, Rong-Hwa
    Yang, Chang-Lin
    Huang, Yau-Chi
    [J]. International Journal of Advanced Manufacturing Technology, 2009, 44 (9-10): : 921 - 927
  • [2] No-wait two-stage multiprocessor flow shop scheduling with unit setup
    Rong-Hwa Huang
    Chang-Lin Yang
    Yau-Chi Huang
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 44 : 921 - 927
  • [3] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [4] Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times
    Wang, Shijin
    Wang, Xiaodong
    Yu, Li
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2020, 7 (03) : 291 - 307
  • [5] A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
    Wang, Shijin
    Liu, Ming
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) : 1064 - 1075
  • [6] Two-stage no-wait scheduling models with setup and removal times separated
    Gupta, JND
    Strusevich, VA
    Zwaneveld, CM
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (11) : 1025 - 1031
  • [7] The two-stage no-wait/blocking proportionate super shop scheduling problem
    Koulamas, Christos
    Panwalkar, S. S.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 2956 - 2965
  • [8] Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling
    Azaiez, Mohamed-Naceur
    Gharbi, Anis
    Kacem, Imed
    Makhlouf, Yosra
    Masmoudi, Malek
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 168
  • [9] A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling
    Wang, Shijin
    Liu, Ming
    Chu, Chengbin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1143 - 1167
  • [10] Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times
    Chang, JL
    Yan, WW
    Shao, HH
    [J]. PROCEEDINGS OF THE 2004 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2004, : 1412 - 1416