The two-stage no-wait/blocking proportionate super shop scheduling problem

被引:7
|
作者
Koulamas, Christos [1 ]
Panwalkar, S. S. [2 ]
机构
[1] Florida Int Univ, Dept Informat Syst & Business Analyt, Miami, FL 33199 USA
[2] Johns Hopkins Univ, Carey Business Sch, Baltimore, MD USA
关键词
scheduling; dynamic programming; super shop; no wait; blocking; proportionate; ALGORITHM; MACHINE;
D O I
10.1080/00207543.2018.1518603
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We analyze the 'no-wait' proportionate two-stage super shop scheduling problem with the objective of minimising the maximum job completion time (makespan). The existing simple sorting procedures for the open shop and the job shop do not work on the super shop. We show that the problem is still solvable in time using a procedure based on dynamic programming (DP). A unique feature of this procedure is that the state variable is defined based on the number of jobs; thus, reducing the complexity to polynomial. The same procedure solves the super shop problem with the blocking constraint. We also consider the case of machine dominance and show that the problem can be solved in linear time. Finally, we highlight the differences between the super shop with 'no-wait' and 'synchronous' processing modes via a numerical example.
引用
收藏
页码:2956 / 2965
页数:10
相关论文
共 50 条
  • [1] Metaheuristics for Two-stage No-Wait Flexible Flow Shop Scheduling Problem
    Ghaleb, Mageed A.
    Suryahatmaja, Umar S.
    Alharkan, Ibrahim M.
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [2] The proportionate two-machine no-wait job shop scheduling problem
    Koulamas, Christos
    Panwalkar, S. S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (01) : 131 - 135
  • [3] A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
    Wang, Shijin
    Liu, Ming
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (04) : 1064 - 1075
  • [4] A column generation-based approach for proportionate flexible two-stage no-wait job shop scheduling
    Pei, Zhi
    Zhang, Xuefang
    Zheng, Li
    Wan, Mingzhong
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (02) : 487 - 508
  • [5] Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection
    Koulamas, Christos
    Kyparisis, George J.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 305 (02) : 608 - 616
  • [6] No-wait two-stage multiprocessor flow shop scheduling with unit setup
    Rong-Hwa Huang
    Chang-Lin Yang
    Yau-Chi Huang
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 44 : 921 - 927
  • [7] No-wait two-stage multiprocessor flow shop scheduling with unit setup
    Huang, Rong-Hwa
    Yang, Chang-Lin
    Huang, Yau-Chi
    [J]. International Journal of Advanced Manufacturing Technology, 2009, 44 (9-10): : 921 - 927
  • [8] No-wait two-stage multiprocessor flow shop scheduling with unit setup
    Huang, Rong-Hwa
    Yang, Chang-Lin
    Huang, Yau-Chi
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10): : 921 - 927
  • [9] A two-stage no-wait job shop scheduling problem by using a neuro-evolutionary variable neighborhood search
    Mokhtari, Hadi
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 74 (9-12): : 1595 - 1610
  • [10] Three meta-heuristics to solve the no-wait two-stage assembly flow-shop scheduling problem
    Mozdgir, A.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Navaei, J.
    [J]. SCIENTIA IRANICA, 2013, 20 (06) : 2275 - 2283