The two-stage no-wait/blocking proportionate super shop scheduling problem

被引:7
|
作者
Koulamas, Christos [1 ]
Panwalkar, S. S. [2 ]
机构
[1] Florida Int Univ, Dept Informat Syst & Business Analyt, Miami, FL 33199 USA
[2] Johns Hopkins Univ, Carey Business Sch, Baltimore, MD USA
关键词
scheduling; dynamic programming; super shop; no wait; blocking; proportionate; ALGORITHM; MACHINE;
D O I
10.1080/00207543.2018.1518603
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We analyze the 'no-wait' proportionate two-stage super shop scheduling problem with the objective of minimising the maximum job completion time (makespan). The existing simple sorting procedures for the open shop and the job shop do not work on the super shop. We show that the problem is still solvable in time using a procedure based on dynamic programming (DP). A unique feature of this procedure is that the state variable is defined based on the number of jobs; thus, reducing the complexity to polynomial. The same procedure solves the super shop problem with the blocking constraint. We also consider the case of machine dominance and show that the problem can be solved in linear time. Finally, we highlight the differences between the super shop with 'no-wait' and 'synchronous' processing modes via a numerical example.
引用
下载
收藏
页码:2956 / 2965
页数:10
相关论文
共 50 条
  • [41] No-wait two stage hybrid flow shop scheduling with genetic and adaptive imperialist competitive algorithms
    Moradinasab, Nazanin
    Shafaei, Rasoul
    Rabiee, Meysam
    Ramezani, Pezhman
    JOURNAL OF EXPERIMENTAL & THEORETICAL ARTIFICIAL INTELLIGENCE, 2013, 25 (02) : 207 - 225
  • [42] A discrete whale optimization algorithm for the no-wait flow shop scheduling problem
    Zhang, Sujun
    Gu, Xingsheng
    MEASUREMENT & CONTROL, 2023, 56 (9-10): : 1764 - 1779
  • [43] Fitness landscape analysis for the no-wait flow-shop scheduling problem
    Czogalla, Jens
    Fink, Andreas
    JOURNAL OF HEURISTICS, 2012, 18 (01) : 25 - 51
  • [44] A Quantum-PSO Algorithm for No-Wait Flow shop Scheduling Problem
    Chang, Junlin
    An, Fengshuan
    Su, Pizhao
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 179 - +
  • [45] Fitness landscape analysis for the no-wait flow-shop scheduling problem
    Jens Czogalla
    Andreas Fink
    Journal of Heuristics, 2012, 18 : 25 - 51
  • [46] Reentrant open shop scheduling problem with time lags and no-wait constraints
    Alioui, Kenza
    Amrouche, Karim
    Boudhar, Mourad
    COMPUTERS & OPERATIONS RESEARCH, 2024, 166
  • [47] EDA-Based for the Green No-wait Job Shop Scheduling Problem
    Yao Y.-J.
    Qian B.
    Dong Y.-M.
    Hu R.
    Wang L.
    Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2021, 49 (02): : 225 - 232
  • [48] Simultaneous minimisation of mean and variation of waiting times in a two-stage proportionate blocking now shop
    Koulamas, Christos
    Kyparisis, George J.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2023, 74 (11) : 2289 - 2299
  • [49] Semi-V-shape property for two-machine no-wait proportionate flow shop problem with TADC criterion
    Kovalev, Sergey
    Kovalyov, Mikhail Y.
    Mosheiov, Gur
    Gerstl, Enrique
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (02) : 560 - 566
  • [50] A two-stage flow shop scheduling problem with transportation considerations
    Chikhi, Nacira
    Abbas, Moncef
    Benmansour, Rachid
    Bekrar, Abdelghani
    Hanafi, Said
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402