Productivity Improvement Through Line Balancing at Electronic Company - Case Study

被引:2
|
作者
Fansuri, A. F. H. [1 ]
Rose, A. N. M.
Ab Rashid, M. F. F.
Mohamed, Nik N. M. Z.
Ahmad, H.
机构
[1] Univ Malaysia Pahang, Fac Mech Engn, Pekan 26600, Pahang, Malaysia
关键词
D O I
10.1088/1757-899X/409/1/012015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A good manufacturing practice for production assembly can result in better productivity for the organization. This study focusses on productivity improvement of Electronics Manufacturing Service Company (EMSC) production assembly. It also aims to reduce waste and to propose a leaner line balancing with the elimination of non-value-added activities during the assembly. This study also aims to utilize current workstation to carter for the needs of the workstation to achieve 39 seconds takt time. Time study has been conducted for all workstations and found that all of the cycle time for each workstation exceeds the required takt time of 39 seconds. The bottleneck is at workstation number two with a recorded standard time of 54.1 seconds to complete the assembly thus causes high work in progress at workstation number two and excessive operator idle time to subsequent workstations. The main issue of EMSC is high volume demands from the customer and committing to the shipment plan. By adding one additional operator to workstation number two and a proper distribution of tasks may help EMSC to increase their production output. Time study is recorded in standard work form for future improvement.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Maintenance Productivity Measurement: Case Study of a Manufacturing Company
    Alli, O. A.
    Ogunwolu, L.
    Oke, O.
    [J]. ADVANCES IN MATERIALS AND SYSTEMS TECHNOLOGIES II, 2009, 62-64 : 565 - 570
  • [22] Process improvement through Six Sigma with Beta correction: a case study of manufacturing company
    E. V. Gijo
    Johny Scaria
    [J]. The International Journal of Advanced Manufacturing Technology, 2014, 71 : 717 - 730
  • [23] Productivity Improvement in Plastic Bag Manufacturing Through Lean Manufacturing Concepts: A Case Study
    Yesmin, Tahera
    Masuduzzaman, Md.
    Zaheer, Ahmed
    [J]. MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 : 1975 - 1982
  • [24] Productivity Improvement Through Multi-Objective Simulation Optimization-A Case Study
    Aldurgam, Mohammad M.
    Alghadeer, Mohammed Y.
    Abdel-Aal, Mohammad A. M.
    Selim, Shokri Z.
    [J]. IEEE ACCESS, 2019, 7 : 40230 - 40239
  • [25] A Case Study of Productivity Improvement by Electrical Prefabrication
    Khaleghian, Hossein
    Shan, Yongwei
    Lewis, Phil
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 1753 - 1761
  • [26] Productivity improvement through a sequencing generalised assignment in an assembly line system
    Moussavi, Seyed-Esmaeil
    Mahdjoub, Morad
    Grunder, Olivier
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (24) : 7509 - 7523
  • [27] Improvement Method of Service Productivity for Taxi Company
    Tanizaki, Takashi
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: COMPETITIVE MANUFACTURING FOR INNOVATIVE PRODUCTS AND SERVICES, AMPS 2012, PT II, 2013, 398 : 329 - 336
  • [28] Implementation of productivity improvement strategies in a small company
    Gunasekaran, A
    Cecille, P
    [J]. TECHNOVATION, 1998, 18 (05) : 311 - 320
  • [29] Productivity Improvement Through Time Study Approach: A Case Study from an Apparel Manufacturing Industry of Pakistan
    Rehman, Ateeq Ur
    Ramzan, Muhammad Babar
    Shafiq, Muhammad
    Rasheed, Abher
    Naeem, Muhammad Salman
    Savino, Matteo Mario
    [J]. 25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 : 1447 - 1454
  • [30] Case study of product line engineering in insurance company
    Kim, Jeong Ah
    [J]. IRI 2006: PROCEEDINGS OF THE 2006 IEEE INTERNATIONAL CONFERENCE ON INFORMATION REUSE AND INTEGRATION, 2006, : 303 - 306